Laserfiche WebLink
2004 Midterm Review <br />Task <br />No.t Task <br />No? Description Original SL-O1 RN-04 <br />& <br />SL-02 2004 <br />Midterm <br />Review <br />12- <br />22 019 Topsoil distribution, <br />item J 46,000 46,000 3,572 . 3,137 <br />23- <br />26c 024 <br />24a Reveg (and misc.), <br />items L & M, cro land 36,500 36,500 2,070 1,193 <br /> 025 <br />25a Reseed Pasture 12,029 7,443 <br /> 026c Reseed pasture and <br />wood lants 1,890 8,011 <br />027 027 Mobilize/demobilize 5,587 5,169 <br /> Operating (indirect) <br />costs 17,000 17,000 10,282 8,927 <br /> <br /> Total 276,200 112,506 40,508 38,200 <br /> <br /> Bond Covera a 288,000 126,006 43,200 43,200 <br />' Task numbers and designations aze those assigned in the Division of Minerals and Geology cost <br />estimate for Permit Renewal 3. <br />z Task numbers and designations aze those assigned in the Division of Minerals and Geology <br />cost estimate for Permit Renewal 4 and the 2004 Mid-term Review Cost Estimate. <br />s PAP, from a deleted Table 4.4-4, page 4-67. Recovered for this review, a copy at Attachment 2. <br />a Retention of Phase I bond coverage for items determined not complete during the Phase I bond <br />release. <br />s The amount necessary for the Division to complete the approved reclamation plan [Rule <br />3.03.1(3)(d)] as of the date of this review. <br />e The required minimum bond coverage until Phase III Bond Release is $43,200 [Rule <br />3.03.1(2)(b), 100%-85%) x $288,000][an amount greater than the $10,000 minimum of Rule <br />3.03.1(4)]. <br />2 Attachments: <br />Attachment 1: Colorado Division of Minerals and Geology Cost Estimate for Remaining <br />Reclamation Work (Summary Form) <br />Attachment 2: PAP, deleted page 4-67 <br />Files: C-84-065 2004 Midterm Review Findings <br />C:\bgw\ W PDOCS\CoalRidge\midtemueview04.doc <br />24 <br />