Laserfiche WebLink
2004 Midterm Review <br />In compliance. A reclamation bond in the amount of $43,200 is in effect (Wells Fargo Bank <br />West N.A., 0133666870). See Section VI below. <br />Rule 3.02.2(4) Reclamation Cost Estimate <br />A revised, as of December 22, 2003, cost estimate for remaining reclamation work is $38,200. <br />See Section VI below. <br />Rule 4.01 General Provisions (Performance Standazds) <br />In compliance. <br />Rule 4.02 Signs and Markers <br />1n compliance. Disturbed azea boundary mazkers are green pickets with white tops. A permit <br />identification sign is maintained at the entrance to the site. <br />Rule 4.03 Roads <br />In compliance. All un-reclaimed roads have been classified as permanent roads. Road <br />certifications aze on file. <br />Rule 4.04 Support Facilities <br />In compliance, With the exception of drainage control and permanent features, all support <br />facilities have been removed. Remaining proposed reclamation activities will have a minimum <br />adverse environmental impact. <br />Rule 4.05 Hydrologic Balance <br />Rule 4.05.1 General Requirements <br />In compliance. <br />Rule 4.05.2 Water Quality Standards and Effluent Limitations <br />In compliance. There is a NPDES (CDPS) permit associated with the site. <br />Rule 4.05.3 Diversions <br />In compliance. There are no diversions of natural drainages at the site. Overland nanoff from <br />disturbed azeas is diverted to Sedimentation Pond A. <br />15 <br />