My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL48846
DRMS
>
Back File Migration
>
General Documents
>
GENERAL48846
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:26:09 PM
Creation date
11/23/2007 4:36:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
General Documents
Doc Date
1/14/2004
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2004 Midterm Review <br />Rule 4.05.4 Stream Diversions <br />In compliance by exception. There aze no stream diversions at the site. <br />Rule 4.05.5 Sediment Control Measures <br />In compliance. Although sediment control structures remain in place, the entire site has been <br />granted Phase II Bond Release. <br />Rule 4.05.6 Sedimentation Ponds <br />In compliance. Although not required, one sediment pond, Sediment Pond A, is still onsite. It has <br />a combined spillway. It is a combination incised and low berm facility. The pond is inspected on <br />a quarterly and yeazly basis. <br />Rule 4.05.7 Dischazge Structures <br />In compliance by exception. The spillway is concrete lined with a concrete outlet. No additional <br />features aze required. <br />Rule 4.05.8 Acid-forming and Toxic-forming Spoil <br />Spoil was not generated at this underground mine. <br />Rule 4.05.9 Impoundments <br />In compliance. Sedimentation Pond A is in compliance with the requirements of this rule, <br />Rule 4.05.10 Underground Mine Entry and Access Discharges <br />In compliance by exception. Although there is a drain provided through the Portal A seal, there <br />has been no recorded dischazge at the site. <br />Rule 4.05.11 Ground Water Protection <br />In compliance. Drill holes and wells were sealed. Although the applicant prepared for more <br />extensive protection of ground water, premature closure of the mine vacated implementation. <br />Rule 4.05.12 Protection of Ground Water Recharge Capacity <br />In compliance. Diminished recharge was not anticipated, and there was no opportunity for <br />diminished recharge due to premature closure of the mine. <br />Rule 4.05.13 Surface and Ground Water Monitoring <br />Rule 4.05.13(1) Ground Water <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.