Laserfiche WebLink
<br /> <br />STIPULATION NO. 7 <br />TOPSOIL MUST HE ANALYZED FOR FERTILIZER ELEMENTS PRIOR TO <br />SEEDING. IF THE SOIL IS FOUND TO BE PHOSPOROUS (PHOSPHORUS, <br />MISSPELLED IN PERMIT DOCUMENT) DEFICIENT, PHOSPHRRUS MUST BE <br />INCORPORATED INTO THE TOPSOIL DURING THE RESPREADING PROCESS. <br />ANY OTHER FERTILIZER ELEMENTS WHICH ARE DEFICIENT IN THE TOPSOII, <br />SHALL BE ADDED AFTER ON (ONE, MISSPELLED IN PERMIT DOCUMENT) <br />YEAR'S GROWTH OF VEGETATION AT A TIME OF YEAR APPROVED HY THE <br />DIVISION. <br />This stipulation applies to future activities and is ongoing. <br />STIPULATION NOS. 8-11 <br />THESE STIPULATIONS HAD HEEN SATISFIED PRIOR TO THE ISSUANCE OF <br />THIS PERMIT. <br />STIPULATION NO. 12 <br />THE PERMITTEE SHALL MAINTAIN RAPTOR BUFFER ZONES ESTABLISHED <br />FOR THE MUNGER CANYON MINE HY THE USFWS FOLLOWING COMPLETION <br />OF THE INITIAL RAPTOR SURVEY CONDUCTED IN JULY, 1983. NO SURFACE <br />DISTURBANCES SHALL OCCUR WITHIN ESTABLISHED BUFFER ZONES <br />EXCEPT AS SPECIFICALLY AUTHORIZED HY CMLRD IN CONSULTATION <br />WITH THE USFWS AND CDOW. <br />This stipulation applies to future activities and is ongoing. <br />STIPULATION NO. 13 <br />THIS STIPULATION HAD BEEN SATISFIED PRIOR TO THE ISSUANCE OF <br />THIS PERMIT. <br />STIPULATION NO. 14 <br />THE DIVISION REQUIRES SALT CREEK MINING TO COMPLETE APPROPRIATE <br />WASTE SHEAR STRENGTH TESTS AND TO SUBMIT THE RESULTS OF THOSE <br />TESTS TO THE DIVISION FOR REVIEW AND APPROVAL, IMMEDIATELY <br />FOLLOWING THE AVAILABILITY OF REPRESENTATIVE COAL WASTE REFUSE <br />MATERIALS. IF SIGNIFICANT MATERIAL STRENGTH VARL4TION OCCURS <br />BETWEEN THE ACTUAL TEST RESULTS AND THOSE VALUES ASSUMED IN <br />COMPLETING THE STABILITY ANALYSIS INCLUDED WITHIN THE <br />AMMENDED PERMIT REVISION APPLICATION, THE DIVISION WILL <br />REQUIRE SALT CREEK MINING TO COMPLETE AMENDED STABILITY <br />ANALYSES AND DESIGN REVISION TO THE WASTE PILE. <br />This stipulation applies to future activities and is ongoing. <br />STIPULATION NO. 15 <br />THE DIVISION DIRECTS SALT CREEK MINING COMPANY TO INSTALL <br />SIGNS AT THE PERMIT BOUNDARY AND AT STATION 67+00' ADJOINING <br />THE HAUL ROAD. THESE SIGNS, LEGIBLE FROM THE HAUL ROAD WHILE <br />PROCEEDING TOWARD THE PORTAL HENCH SHALL READ: "ROAD SLOPES <br />SUBJECT TO ROCKFALL AND SLOPE FAILURE -PROCEED WITH CARE." <br />This stipulation applies to future activities and is ongoing. <br />STIPULATION NO. 16 <br />PRIOR TO CONSTRUCTION OF THE HAUL ROAD, THE APPLICANT MUST <br />PROPOSE THE INSTALLATION OF ADDITIONAL ROAD SURFACE DRAINAGE <br />