Laserfiche WebLink
Status: This stipulation was satisfied and terminated on 27 October 1981. <br />Stipulation No. 7: THE APPLICANT MUST ALSO COMMIT TO PROVIDING A <br />MITIGATION PLAN SHOULD THE EFFECTS OF DRAWDOWN IN THE WHITE RIVER <br />ALLUVIAL AQUIFER DETRIMENTALLY EFFECT ESTABLISHED AGRICULTURAL <br />ACTIVITIES, EITHER THROUGH UNFORESEEN IMPACTS OR FROM GROUNDWATER <br />DEPLETIONS WHICH ARE LARGER THAN EXPECTED. <br />Status: This stipulation was satisfied and terminated on 9 May 1986. <br />Stipulatiou No. 8: PRIOR TO THE DEVELOPMENT OF MAINS AND SUB-MAINS <br />BENEATH THE ALLUVIAL BODY OF RED WASH, THE APPLICANT MUST SUBMIT <br />THE INFORMATION REQUIRED BY SECTION 2.06.8(4) OF THE COLORADO <br />REGULATORY PROGRAM, ALONG WITH THE PLAN TO ENSURE THAT THE <br />PERFORMANCE STANDARDS AND MONITORING REQUIREMENTS OF SECTION 4.24 <br />ARE MET. THIS PLAN MUST ADDRESS THE ANALYSIS OF SUBSIDENCE <br />MONITORING DATA UNTIL THE SUBMITTALS ARE APPROVED BY THE <br />REGULATORY AUTHORITY. <br />Status: This stipulation was satisfied and terminated on 9 May 1986. <br />Stipulatiou No. 9: THE APPLICANT MUST ALSO SUBMIT, AS PART OF THE PERMIT <br />APPLICATION, WRITTEN DOCUMENTATION AS TO THE NATURE OF THE <br />REGIONAL IRRIGATION INVENTORY PERFORMED. THIS DOCUMENTATION MUST <br />ADDRESS THE DEFICIENCIES OUTLINED IN SECTION C OF THIS TEA, SO THAT THE <br />AVF DETERMINATION FOR SCULLION GULCH CAN BE ADEQUATELY <br />SUBSTANTIATED. THE INFORMATION SHOULD BE SUBMITTED WITHIN 30 DAYS <br />OF THE GRANTING OF THE PERMIT. <br />Status: This Stipulation was satisfied and terminated on 10 August 1981. <br />Stipulatiou No. 10: THE APPLICANT SHALL PROVIDE THE REGULATORY <br />AUTHORITY WITH A CORRECTED VERSION OF MAP 77, REFUSE DISPOSAL AREA <br />SITE PREPARATION WHICH SHOWS THE LOCATION OF THE CULVERT THAT <br />CARRIES FLOW FROM THE NON-TOXIC FILL STOCKPILE DITCH ACROSS THE HAUL <br />ROAD INTO THE SUBAREA R2-3 SEDIMENT POND. THIS INFORMATION SHOULD BE <br />SUBMITTED WITHIN 90 DAYSOF APPROVAL OF THE MINE PLAN PERMIT. <br />Status: This stipulation was satisfied and terminated on 27 October 1981. <br />Stipulation No. 11: WITHIN 60 DAYS OF APPROVAL OF THE MINING PERMIT, THE <br />APPLICANT SHALL PROVIDE DITCH DIMENSIONS FOR THE ENTIRE "NORTH <br />TOPSOIL DITCH" IN THE D-PORTAL AREA. THESE PLANS MUST BE SUBMITTED <br />AND APPROVED PRIOR TO THE ONSET OF CONSTRUCTION AT THE D-PORTAL <br />AREA. <br />