My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL47948
DRMS
>
Back File Migration
>
General Documents
>
GENERAL47948
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:23:30 PM
Creation date
11/23/2007 3:57:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
General Documents
Doc Date
12/15/1982
Doc Name
Proposed Decision and Findings of Compliance
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />-4- <br />Stipulation No. 8_ <br /> <br />PRIOR TO SECONDARY OR RETREAT MINING AT THE MAXWELL MINE, THE PERMITTEE <br />SHALL PROVIDE A HYDROLOGIC SURVEY IDENTIFYING ALL ALLUVIAL AQUIFERS IN, <br />OR ADJACENT TO THE PERMIT AREA (EXCEPT FOR THE PURGATOIRE RIVER ALLUVIAL <br />AQUIFER WHICH HAS ALREADY BEEN IDENTIFIED). THIS SURVEY SHALL CONTAIN <br />INFORMATION CONCERNING DEPTH BELOW THE SURFACE, HORIZONTAL EXTENT, WATER <br />USE, AND QUANTITY AND QUALITY OF GROUND WATER AS REQUIRED UNDER RULE <br />2.04.7(1). THE PERMITTEE SHALL ALSO PROVIDE A DISCUSSION OF THE <br />PROBABLE HYDROLOGIC CONSEQUENCES OF MINING UPON THOSE ALLUVIAL AQUIFERS <br />IDENTIFIED. <br />Stipulation No. 9 <br />PRIOR TO THE DISPOSAL OF ANY WASTE MATERIAL (i.e. DEVELOPMENT WASTES, <br />COAL PROCESSING WASTES, REFUSE, ETC.) ON THE ALLUVIUM OF CIRUELA CANYON, <br />THE PERMITTEE SHALL: <br />A) INSTALL A DOWNGRADIENT MONITORING WELL IN THE ALLUVIUM OF CIRUELA <br />CANYON WHICH IS COMPLETED INTO BEDROCK; <br />B) CONDUCT A PUMPING TEST ON THE ALLUVIUM TO DETERMINE THE <br />PERMEABILITY, TRANSMISSIVITY, AND SPECIFIC YIELD OF THE CIRUELA <br />CANYON ALLUVIUM, OR PROVIDE EXTRAPOLATED INFORMATION FROM SIMILAR <br />ALLUVIAL AQUIFERS; <br />C) COLLECT BASELINE GROUND WATER QUALITY AND GROUND WATER LEVEL DATA <br />ON THE CIRUELA CANYON ALLUVIAL WELL; <br />D) ASSESS THE HYDROLOGIC IMPACTS OF THE DISPOSAL PILE AND DEMONSTRATE <br />THAT THE PROPOSED PILE DESIGN WILL MINIMIZE THE IMPACTS TO THE <br />QUALITY AND QUANTITY OF ALLUVIAL GROUND WATER IN CIRUELA CANYON AND <br />IN THE PICKETWIRE VALLEY. <br />E) SUBMIT THE ASSESSMENT AND DESIGN TO THE DIVISION FOR APPROVAL AS A <br />REVISION. <br />Stipulation No. 10 <br />AFTER A THOROUGH REVIEW OF THE BASELINE WATER QUALITY DATA, THE <br />OVERBURDEN CHEMISTRY DATA SUBMITTED BY CF&I, AND 7HE RECEIVING STREAM <br />STANDARDS, THE DIVISION REQUIRES MONITORING TO INCLUDE THE FOLLOWING: <br />A) MONTHLY MONITORING OF THE PURGA70IRE RIVER UPSTREAM OF 7HE MAXWELL <br />MINE, THE PURGATOIRE RIVER BELOW THE CONFLUENCE WITH CIRUELA CANYON <br />(OLD CHANNEL), AND THE MAXWELL MINE DISCHARGE. THE PARAMETERS TO <br />BE MONITORED INCLUDE FLOW, FIELD pH, FIELD ELECTRO-CONDUCTIVITY AND <br />FIELD WATER TEMPERATURE. <br />B) MONTHLY MONITORING OF THE PURGATOIRE RIVER ALLUVIAL WELLS UPSTREAM <br />AND DOWNSTREAM OF THE MAXWELL MINE, AND MONTHLY MONITORING OF THE <br />ALLUVIAL WELL IN CIRUELA CANYON. THE PARAMETERS TO BE MONITORED <br />INCLUDE GROUND WATER LEVELS, FIELD pH, FIELD ELECTRO-CONDUCTIVITY <br />AND FIELD WATER TEMPERATURE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.