Laserfiche WebLink
• -5- • <br />C) QUARTERLY MONITORING, (FEBRUARY, MAY, AUGUST, AND NOVEMBER) OF <br />MAXWELL MINE DISCHARGE. THE PARAMETERS TO BE MONITORED INCLUDE <br />FLOW, fIELD pH, FIELD ELECTRO-CONDUCTIVITY, FIELD WATER <br />TEMPERATURE, TURBIDITY, TOTAL SUSPENDED SOLIDS, TOTAL DISSOLVED <br />SOLIDS, TOTAL COMBUSTIBLE SOLIDS, TOTAL HARDNESS, TOTAL IRON, TOTAL <br />MANGANESE, AND PARAMETERS REQUIRED UNDER THE PERMITTEE'S NPDES <br />PERMIT. <br />D) ANNUAL MONITORING (NOVEMBER) OF THE PURGATOIRE RIVER UPSTREAM OF <br />THE MAXWELL MINE, THE PURGA70IRE RIVER BELOW THE CONFLUENCE WITH <br />CIRUELA CANYON (OLD CHANNEL) AND THE MAXWELL MINE DISCHARGE. THE <br />PARAMETERS TO BE MONITORED INCLUDE THE FIELD PARAMETERS IDENTIFIED <br />ABOVE IN THIS STIPULATION, DISSOLVED OXYGEN, TURBIDITY, TOTAL <br />SUSPENDED SOLIDS, TOTAL COMBUSTIBLE SOLIDS, TOTAL DISSOLVED SOLIDS, <br />TOTAL HARDNESS, AND TOTAL RECOVERABLE MEASUREMENTS FOR THE IONS <br />CARBONATE, BICARBONATE, CHLORIDE, SULFATE, AMMONIA, <br />NITRATE/NITRITE, CALCIUM, MAGNESIUM, POTASSIUM, SODIUM, BORON, <br />CADMIUM, COPPER, IRON, LEAD, MANGANESE, MERCURY, NICKEL, SELENIUM, <br />ZINC, SILVER, AND A DETERMINATION OF SAR. <br />E) ANNUAL MONITORING (NOVEMBER) OF THE PURGATOIRE RIVER ALLUVIAL WELLS <br />ABOVE AND BELOW THE MAXWELL MINE AND THE CIRUELA CANYON ALLUVIAL <br />WELL BELOW THE DISPOSAL PILE. THE PARAMETERS TO BE MONITORED <br />INCLUDE GROUND WATER LEVELS, FIELD pH, FIELD ELECTRO-CONDUCTIVITY, <br />FIELD WATER TEMPERATURE, TOTAL DISSOLVED SOLIDS AND DISSOLVED IONS <br />MEASUREMENTS FOR CARBONATE, BICARBONATE, CHLORIDE, SULFATE, <br />SULFIDE, AMMONIA, NITRATE/NITRITE, CALCIUM, MAGNESIUM, POTASSIUM, <br />SODIUM, BORON, CADMIUM, COPPER, IRON, LEAD, MANGANESE, MERCURY, <br />NICKEL, SELENIUM, ZINC, SILVER, AND A DETERMINATION OF SAR. <br />F) SUBMIT ALL SURFACE AND GROUND WATER MONITORING DATA QUARTERLY. <br />G) MONITORING REQUIREMENTS MAY BE REDUCED 8Y THE DIVISION UPON THE <br />SUBMITTAL OF ADDITIONAL DATA AND A FORMAL REDUCTION REQUEST. <br />Stipulation No. 11 <br />THE PERMITTEE SHALL CONDUCT MINE INFLOW STUDIES FOR ALL ACTIVE OR <br />UNSEALED UNDERGROUND COAL MINE WORKINGS. ANNUAL INFLOW STUDIES SHALL BE <br />CONDUCTED FOR EACH ACTIVE OR UNSEALED AREA OF WORKINGS IN THE MONTH OF <br />JUNE, AND THE RESULTS OF EACH INFLOW STUDY SHALL BE SUBMITTED TO THE' <br />DIVISION BY THE FIRST OF AUGUST OF THE SAME YEAR. THE MINE INFLOW <br />STUDIES SHALL INCLUDE: <br />A) THE MAPPING OF EACH POINT SOURCE INFLOW (I.E. FAULTS, FRACTURED <br />ROOF, FRACTURED FLOOR, EXPLORATION DRILL HOLE, ETC.) AND EACH AREA <br />WIDE INFLOW (I.E., DRAINAGE FROM SEALS 70 ABANDONED MINE WORKINGS: <br />AREAS OF WEEPING COAL FACES, ROOF, OR FLOOR, ETC.) ON UP-TO-DATE <br />MINE WORKINGS MAPS; <br />B) THE PRODUCTION OF TABLES OF ALL POINT SOURCE INFLOWS MAPPED WITH <br />DATA ON 7HEIR FLOW RATES. <br />