Laserfiche WebLink
r <br />-3- <br />Stipulation No. 3 <br /> <br />THE PERMITTEE MUST DEVELOP AND SUBMIT A SURFACE WATER BUDGET THAT <br />ADDRESSES THE AMOUNT OF WATER REMOVED FROM THE PURGATOIRE RIVER, THE <br />AMOUNT OF WATER THAT IS CONSUMPTIVELY USED DURING MINING, AND THE AMOUNT <br />THAT IS DISCHARGED TO THE RIVER. THIS INFORMATION MUST BE SUBMITTED TO <br />THE DIVISION WITHIN 30 DAYS OF PERMIT ISSUANCE AND IS TO BE INCLUDED AS <br />PART OF THE PROBABLE HYDROLOGIC CONSEQUENCES DISCUSSION. <br />Stipulation No. 4 <br />THE PERMITTEE SHALL CONDUCT A PRELIMINARY SPRING AND SEEP SURVEY USING <br />AERIAL PHOTOGRAPHY OF THE PERMIT AND ADJACENT AREAS. THE PRELIMINARY <br />SPRING SURVEY SHALL CONSIST OF A MAP OF THE PERMIT AND ADJACENT AREAS <br />WHICH WILL SHOW THE LOCATION OF ALL POTENTIAL SPRING AND SEEPS <br />IDENTIFIED ON THE AERIAL PHOTOGRAPHS. THE PRELIMINARY SPRING SURVEY <br />SHALL BE SUBMITTED TO THE DIVISION WITHIN 30 DAYS OF THE PERMIT ISSUANCE <br />AND BEFORE THE CON4~1ENCEMENT OF MINING IN THE MAXWELL MINE. <br />Stipulation No. 5 <br />THE PERMITTEE SHALL VERIFY THE LOCATIONS OF ALL SPRINGS AND SEEPS <br />IDENTIFIED IN THE PRELIMINARY SPRING SURVEY THROUGH A FIELD SURVEY. <br />THIS FIELD SPRING SURVEY SHALL INCLUDE A DESCRIPTION OF EACH SPRING OR <br />SEEP KEYED TO A LOCATION MAP. THE DESCRIPTION SHALL CONTAIN THE <br />POTENTIAL OR OBSERVED•SOURCE OF EACH SPRING OR SEEP (i.e., SANDSTONE <br />OUTCROP, ALLUVIUM, FAULT ZONE, FRACTURE ZONE, ETC.); THE MEASURED OR <br />ESTIMATED FLOW RATE OF EACH SPRING OR SEEP; AND THE FIELD MEASUREMENT OF <br />pH, ELECTRO-CONDUCTIVITY, AND TEMPERATURE FOR EACH SPRING OR SEEP. THIS <br />SPRING SURVEY SHALL BE CONDUCTED IN MARCH OR APRIL OF 1984, WHEN WEATHER <br />PERMITS ACCESS TO THESE AREAS. RESULTS OF THE FIELD SPRING SURVEY SHALL <br />BE SUBMITTED TO THE DIVISION BY JUNE 1, 1984. <br />Stipulation No. 6 <br />THE PERMITTEE SHALL MONITOR THE FLOWS OF ALL SPRINGS AND SEEPS WITHIN <br />THE MAXWELL MINE'S PERMIT AND ADJACENT AREAS ON A MONTHLY BASIS FOR ONE <br />GROWING SEASON (APRIL THROUGH OCTOBER). THE PERMITTEE MAY REQUEST A <br />REDUCTION IN SPRING AND SEEP MONITORING FOLLOWING THE SUBMITTAL OF THE <br />DATA OBTAINED DURING THE GROWING SEASON, ANU SUBMITTAL OF AN ASSESSMENT <br />OF THE SIGNIFICANCE OF THE SPRINGS AND SEEPS TO SURFACE FLOWS, <br />IRRIGATION PRACTICES, LIVESTOCK WATERING, WILDLIFE WATERING, AND <br />DOMESTIC USE. <br />Stipulation No. 7 <br />WITHIN 90 DAYS OF PERMIT ISSUANCE, THE PERMITTEE SHALL PROVIDE A MAP <br />SHOWING THE LOCATION OF ALL WELLS WITHIN ONE MILE OF THE PERMIT AREA. <br />IN ADDITION, THE PERMITTEE SHALL ASSESS THE PROBABLE HYDROLOGIC <br />CONSEQUENCES OF MINING ON THOSE WELLS. <br />