Table of Contents (continued)
<br />XV,
<br />XYI.
<br />XVII,
<br />XVIII.
<br />XTX.
<br />XX.
<br />XXI.
<br />XXII.
<br />XXIIT.
<br />XXIV,
<br />XXV,
<br />XXVI,
<br />XXV II.
<br />XXYIII
<br />XXIX,
<br />Operations Description - Rules 2,05,2, 2,05,3(2) and 4,01 ,
<br />Explosives - P.u1es 2.05,3(6) and 4,08
<br />Backfilling and Grading - Rules 2.05,3(3) ,2.05.3(4),
<br />2,05,4(2)(a), 2.05,4(2)(c), 4.09, 4.13 and 4,14 .
<br />Coal Processing Waste and Non-Coal Processing Waste - Rules
<br />2,05.3(8), 2,05,4(2)(f). 4.10 and 4,11
<br />Mine Facilities, Coal Handling Structures, Support
<br />Facilities - Rules 2.05,3(3), 2,05,3(7) and 4.04
<br />Roads - Rules 2.05,3(3) and 4,03
<br />Bonding - Rule 2.05.4(2)(b)
<br />Sealing of Drilled Holes and Underground Openings - Rules
<br />2.05.4(2)(8) and 4,07
<br />Subsidence - Rules 2,05.6(6) and 4,20 .
<br />Special Categories of Mining Other Than AVF and Prime
<br />Farmland - Rules 2.06, 4.22, 4.23, 4.26, 4,27, 4,28
<br />and 4, 29 ,
<br />. .. ......... .....
<br />Miscellaneous Compliance - Rules 2.05,6(5), 4,02, 4,12,
<br />4,19, 4,21, 4,28 and 4,30. .
<br />Operations on Land Subject to Limitations or Prohibitions -
<br />Rules 2.03,7 and 2.10
<br />Demonstration that Surface Coal Mining and~Reclamation
<br />Operations can be Feasibly Accomplished - Rule 2.07.6(2)(b)
<br />Compatibility with Anticipated Adjacent Operations - Rule
<br />2 07 6(2)(i)
<br />Page
<br />26
<br />27
<br />27
<br />28
<br />28
<br />, 28
<br />, 29
<br />30
<br />. 30
<br />. 30
<br />31
<br />. 31
<br />31
<br />. . ........................
<br />Reclamation Fees Required by 30CFR, Chapter VII, Sub-chapter R -
<br />Rule - 2.07,6(2)(0) .
<br />32
<br />32
<br />_ii_
<br />
|