Table of Contents
<br />Page
<br />Introduction 1
<br />Proposed Decision 2
<br />Stipulations to the Permit 3
<br />Summary - The Review Process, 4
<br />Description of the Environment,
<br />Description of the Operations and
<br />Reclamation Plan.
<br />Findings of the Colorado Mined Land 8
<br />Recl amation Division
<br />I. Legal, Financial, and Compliance Information - Rules 2.03,
<br /> 2,07, 6(2)(f), 2.07,6(2)(9) and 2,07.6(2)(h) 8
<br />II. Land Use - Rules 2.04,3, 2.05.5 and 4.16 8
<br />III. Cultural and Historic Resources - Rules 2.04.4 and 2.05.6(4) 9
<br />IY, Geology - Rules 2,04.5 and 2.04.6 10
<br />V. Surface Water Hydrology - Rules 2,04,5, 2.04,7, 2.05.3(4),
<br /> 2.05.6(3) and 4.05
<br />. .. ............. . 11
<br />VI, Ground Water Hydrology - Rules 2.04.5, 2,04,7, 2.05.6(3) and
<br /> 4.05
<br />....... .. ............... 12
<br />YII. Alluvial Valley Floors - Rules 2,06,8, 2.07.6(2)(k) and 4.24 13
<br />VIII, Water Rights and Replacement - Rules 2.04.7(3);
<br /> 2.05,6(3)(a)(11), 2,07.6(2)(c) and 4.05.15 15
<br />IX. Assessment of Probable Hydrological Consequences of Mining and
<br /> Cumulative Hydrologic Impacts - Rules 2.05.6(3) and
<br /> 2.07.6(2)(c) 15
<br /> A. Introduction
<br /> B, Surface Water Assessment
<br /> C, Ground Water effects
<br />X, Climatological Information and Air Resources - Rules 2,04,8,
<br /> 2.05.4(2)(h), 2,05.6(1) and 4,19 20
<br />XI. Topsoil -Rules 2.04.9, 2.05.3(5), 2.05.4(2)(d) and 4,06. 21
<br />XII. Vegetation - Rules 2.04.10, 2.05.4(2)(e), 4.15 and
<br /> 4.18(4)(1)
<br />... ............. .... 22
<br />XIII. Fish and Wildlife - Rules 2.04,11, 2.05.6(2) and 4,18 25
<br />XIV, Prime Farmland - Rules 2.04,12, 2.06.6 and 4.25 25
<br />-i-
<br />
|