Laserfiche WebLink
Broda's Inert Fill <br />Reclamation Plan <br />4/21/03 <br />Pate 3 of 3 <br />appropriate rate and mixture: nitrogen (18%-27 lbs/acre), phosphorus (46%-69 <br />Ibs/acre}, and potassium (0%-0 lbs/acre). <br />All areas of the site should be inspected every spring and once a month during the <br />summer to determine the presence of weeds. If weeds aze found to be present, the <br />first major to control weeds shall be mowing as needed. If we'd killer is proposed, the <br />NRCS office in Brighton shall be consulted for herbicide recommendations. <br />Wetlands <br />The wetlands azea immediately adjacent to Bull Seep Ditch have already been <br />revegetated. This azea will be left undisturbed. If for some reason the aeeas aze disturbed <br />they will be revegetated with an identical plant mixture of the existing vegetation. <br />Conclusion <br />The reclamation plan for Broda's Inert Fill will be completed in the same fashion <br />originally approved by the MLRB for the Aggregate Industries, Inc. <br />