My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL47239
DRMS
>
Back File Migration
>
General Documents
>
GENERAL47239
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:22:06 PM
Creation date
11/23/2007 3:19:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981040
IBM Index Class Name
General Documents
Doc Date
5/6/1996
Doc Name
PEACOCK MINE MAINTENANCE PROJECT C-81-042 DOCUMENTED TELEPHONE QUOTES BID PKA-7-1016
From
DMG
To
INTERESTED CONTRACTORS
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19.0 EQUIPMENT RENTAL <br />19.1 DESCRIPTION <br />This specification covers the furnishing and operation of equipment for other supplemental <br />earthwork as directed by the PROJECT MANAGER. <br />19.2 EQUIPMENT <br />All equipment shall be of the type and equipped as specified in the Special Conditions and on <br />the Invitation and Bid. Mounted or attached equipment shall be that customarily <br />manufactured for the respective size of equipment being offered. Size will be determined by <br />maximum flywheel horsepower ratings at sea level and are the minimum size that shall be <br />furnished and operated. <br />Equipment must be in good operating condition and must be maintained in good operating <br />condition by the CONTRACTOR throughout the life of the contract. The PROJECT MANAGER <br />shall be the sole judge of whether equipment is or is not in "good operating condition". <br />The number of hours indicated in the Special Conditions and on the Invitation and Bid Sheet <br />are estimated. It is impossible to determine in advance the actual number of hours that the <br />equipment will be required to be used, or to guarantee that any equipment rental will be <br />necessary. <br />Calculations for FHP Adjustments <br />Equipment of any size above the minimum flywheel horsepower may be furnished subject to <br />the approval of the PROJECT MANAGER. In order to evaluate the bids for various sizes of <br />equipment proposed to be furnished by the bidders, the unit price inserted in the bid must be <br />adjusted. The bidder may figure the unit price to insert in the Invitation and Bid by doing the <br />following computation for the applicable bid item: <br />(Rate you want oer hour) X (Recuested FHPI =Price on Bid Schedule <br />(The FHP of your machine) <br />EXAMPLE: If the desired unit rate to be received is 570.00/hour fora 215 FHP bulldozer and <br />the minimum FHP requested is 140, then multiply 570.00 x 140/215 = 545.50 per hour. <br />Use that calculated amount (545.50 in the example) as the unit price on the Invitation and <br />Bid. If the CONTRACTOR plans to furnish a machine other than the minimum FHP listed on <br />the Invitation and Bid, he must write the FHP of the machine, in ink, under the bid item on the <br />Invitation and Bid, or include it on the List of Equipment Offered form. <br />After the successful bidder has furnished evidence of the FHP capacity of the equipment to <br />be used, the amount bid for Equipment Rental will be modified by reversing the above <br />procedure to reflect the unit price desired by the CONTRACTOR with a corresponding <br />reduction in the quantity of hours required. This modified hourly rate and number of hours <br />will appear on the Purchase Order. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.