19.3 EXECUTION <br />Operators <br />The equipment shall be furnished complete with competent operating personnel. Operators <br />shall be qualified to perform all work under this specification in a skillful and professional <br />manner. The OWNER may, in writing, require the CONTRACTOR to remove from the work <br />any employee the OWNER deems incompetent or careless. The OWNER will be the sole judge <br />of the acceptability of any employee. <br />Supervision <br />The CONTRACTOR shall be responsible for the supervision of all mechanical operations of the <br />equipment including proper maintenance. <br />Equipment maintenance, fueling and repairs shall be done sot that spilling of lubricants and <br />fuel is minimized. <br />Performance of Work <br />Supplemental work shall be performed after the general construction work in that particular <br />area and shall consist of general earthmoving or other finishing work as may be directed by <br />the PROJECT MANAGER. <br />All operations under this section will be under the direct supervision of the PROJECT <br />MANAGER and work under this section shall be performed only as ordered and directed by <br />the PROJECT MANAGER. The PROJECT MANAGER will designate the work to be performed <br />and the order in which it is to be done, and WILL inspect all work. The PROJECT MANAGER <br />will maintain documentation of the work. <br />Equipment Rental Documentation <br />At the close of each day's operations during which equipment rental work has been conducted <br />under this specification, the PROJECT MANAGER shall prepare a form entitled "Equipment <br />Rental Record" listing the date, times and total hours (computed to the nearest one-half hour), <br />each piece of equipment was operated in accordance with this specification. The PROJECT <br />MANAGER will obtain the signature of the CONTRACTOR on the form. <br />"Operation" means that time spent in performing work as well as time necessary for moving <br />equipment around the work site when directed by the PROJECT MANAGER. However, <br />"operation" does not include that time spent in transporting the equipment to the initial work <br />site, removing the equipment when all work had been completed, transporting the equipment <br />away from and returning it to the work site in the event of a temporary or seasonal <br />suspension of operation, maintenance of the equipment, any time during which the equipment <br />is "bogged down" or otherwise not working, nor for any periods when operations are <br />suspended by the PRINCIPLE REPRESENTATIVE. <br />4 <br />