Laserfiche WebLink
3. Automobile Liability (Minimum). The contractor must carry a minimum of 5600,000 <br />combined single limit. <br />Work Description <br />Hourly bids are being solicited for work to be performed at the Peacock Mine site in Hay Gulch <br />southwest of Durango, Colorado. Machine work will involve the recontouring of access roads <br />to the portal area. The portal area has previously been reclaimed but the roads will be pulled <br />back to approximate original contour. All recontoured or otherwise impacted areas will be <br />revegetated as described below. <br />All equipment rental hours will be conducted per the attached 19.0 Equipment Rental <br />specifications. The Project Manager must be on site for all equipment rental hours. The <br />Project Manager will be available during regular business hours (8:00 A.M. to 5:00 P.M.1 on <br />weekdays. Equipment Rental time will not be scheduled on weekend days or holidays without <br />prior approval of the Project Manager. <br />11 Hydraulic Excavator. Hours -Bids are being solicited for an excavator with a minimum <br />25' reach and a minimum 30"I bucket with operator. Mobilization will be included in <br />the submitted hourly rate. Work will consist of the pulling back of approximately 1400 <br />linear feet of approximate 20' wide road. Recontouring will be to approximate original <br />contour involving the placement of downslope material and the blending in of the upper <br />slope cut. Payment for all machine work will be based to the nearest 1 /2 hour per <br />19.0 Equipment Rental specifications. 40 hours are estimated to be the time required <br />to complete the site work. This is an estimate only. The total 40 hours are NOT <br />guaranteed. <br />2) Reveaetation -After recontouring delineated access roads, all disturbed areas will be <br />reseeded with seed provided by the State. Seed will be sown uniformly on the <br />prepared areas. Broadcast seed will be covered about 1/4 to 1/2 inch deep by a <br />method acceptable to the Project Manager. All reseeded areas will be mulched with <br />hay or straw mulch and certified to be pest and weed-free. Mulch will be supplied by <br />the Contractor. Approximately 30 percent by weight of the mulch material will be 10 <br />inches in length or longer. Hay or straw mulch will be applied uniformly at the rate of <br />two tons per acre. If hydromulching is chosen, hydromulch will be applied at the rate <br />of 1 1 /2 tons per acre. Mulch will be crimped (stabilized or anchored) into the soil by <br />hand with a suitable tool on 18" centers. The cost for revegetation will be based on <br />lump sum. The area to be revegetated is estimated to total 1.5 acres not to exceed <br />2.0 acres. <br />Project work is expected to be performed between May 20 through the 24, 1996. Please <br />refer to the attached site map and bid schedule. <br />2 <br />