My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL47151
DRMS
>
Back File Migration
>
General Documents
>
GENERAL47151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:21:57 PM
Creation date
11/23/2007 3:11:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977247
IBM Index Class Name
General Documents
Doc Date
12/4/1996
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ROADABLE EDUIPMENT: <br />To[el Ems. Fleet Size Naul Trfp Return Trlp <br />Msehine Deacri.ptlon Coat/hr <ro. hauled) Cost/hr Cost/hr <br />..........e ...........................................:..__._._............._...........~__.......... <br />Subtotals : 50.00 50.00 <br />cheer 2 of~2 <br />MOB/DEMOB SUPPORT EDUIPMEMT: <br />Yelght Ownership Haul Rip Fleet Size Haul trip Return Trip DOT Permit <br />Man-ROedable Eqp. Description (tans) Cost/hr Cost/hr (m. hauled) Lost/hr Cost/hr Coe[/ea <br />------------- ---- ------- -- ----------- - <br />Subtote is f0.00 50.00 f0.00 <br />Total Eop. Flee[ Size Raul Trip Return Trip <br />Roadable Eop. Description Cost/hr (no. hauled) Cost/hr Cost/hr <br />Subtotelc 50.00 50.00 <br />EWIPMEMT HAUL DISTANCE i TIME <br />Nearest aejor city or town within project area region: Salida <br />Total one way travel disterce = 15.0 miles. Average travel speed = 40.00 mph. <br />Jab Time - Mon Roadable Equip.= 0.75 hours load Roadable Equip.= N/A hours load <br />038 hours haul 0.38 hours haul <br />0.75 hours unload N/A hours unload <br />0.38 hours return 0.38 hours return <br />J08 COST Total Mob/Demob Cost = 51,230.14 <br />NOTE: Man-roadeble equipment (haul rig required to transport) mob/demob costs based on 2 round trips, each trip <br />consisting of a one-way loaded haul end a one-way empty return. Roadable equi Anent (no haul rig required) <br />costs based on one round trip. Colorado DOT requires special permits for oversize equipment on terrain <br />specified toed segnents within the State. Separate perniis are required for each rip on each loaded trip. <br />Addi tiorelLy, pilot tars (one or two per rig depending on degree of oversize) ere also required for oversize <br />equipment hauling, and loading/unloading times must be increased substantially for equipment which oust be <br />partially dismantled for transport and re-assembled at the job site. Costs for lift irg equipment and other <br />support equipment needed for this work should be included in the mob/demob costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.