My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL47151
DRMS
>
Back File Migration
>
General Documents
>
GENERAL47151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:21:57 PM
Creation date
11/23/2007 3:11:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977247
IBM Index Class Name
General Documents
Doc Date
12/4/1996
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />COLORADO DIVISION OF MINERALS AND GEOLOGY <br />DOZER COST i PERFORWINCE DATA LAIlKSNEET <br />Msehlro Make i Model: Cat 08M <br />Dozer Blade: UNIVERSAL <br />Attaclrcnt /1: ROPS Cab <br />Attachment /2: <br />Last Cost Revision: Aprl 1, 1995 <br />BASE EQUIPMENT COSTS (CRG) <br />sheet 1 of 2 sheets <br />REFERENCES: 1) Coat Refererrce Guide (CRG) <br />2) Cantraetoro Equtpamt Cost Guide (CECG) <br />3) Colorsdo Contractors Aaeociatlan <br />Vage Rete Schedule <br />4) Caterplller Perforswice HaMwok <br />I_______.__. Base Ovrcrship i Overhsul Costs ----------°~_____________° Base Opereting Costs _____________. <br />Gnersh ip ~ Overhaul ~ Fleld Repalr <br />Deprec lot lon CFC Overhead ~ Labor Pertc~ Labor Psrts ~ Fuel Lube Tires G.E.C. <br />Machirc f17.05 f8.86 (6.52 (4.63 (11.63 (5.14 (9.35 (9.91 (3.25 f0.00 f1.5! <br />At[schment /1 f0.00 (0.00 50.00 (0.00 f0.00 (0.00 (0.00 (0.00 (0.00 50.00 f0.0( <br />Attseheent tR (0.00 50.00 50.00 f0.00 f0.00 (0.00 f0.00 f0.00 f0.00 (0.00 f0.0( <br />COST ADJUSTMENT FACTORS (CECG) <br />Factor Description Bese Value Adj. Value <br />Acqui si tlon cost: (358,560.00 5288,882.ffi <br />Econ. life hra.-anchine: 13,245 10,455 <br />-attach. /1: 11,000 11,000 <br />-attach. (f2: N/A N/A <br />Amuel use hours: 2,112 1,525 <br />Meehenic's labor cost: (27.15 (23.32 <br />Fuel cost/gaL.-gasollre: 51.15 (1.15 <br />-diesel: f0.9< f0.94 <br />Lute cost: (3.25 (3.25 <br />Tire life hours: 0 0 <br />Tire factor: 0 0 <br />Tire cost: (0.00 (0.00 <br />ADJUSTED EW IPMENT CASTS <br />Multiplier <br />0.806 <br />1.267 <br />1.000 <br />1.000 <br />1.385 <br />0.859 <br />1.000 <br />1.000 <br />1.000 <br />1.000 <br />1.000 <br />1.000 <br />ALWIS ITION COST BREAKOOW <br />Coat Elements (CECG) Factor Adj. Coat <br />Bsse purchase price ~ 5358,560.00 <br />Less dealer dfeeount 0.100 f35, 856.00 <br />Plus freight 0.020 f7, 171.20 <br />Plus dealer eharges• 0.005 51,792.80 <br />•MLRD esti~ste <br />Adjusted purchase price 5331,668.00 <br />Plus taxes: Sales B 3X (9,950.04 <br />SMM B2X 56,633.36 <br />Less tare cost f0.00 <br />Less selvage value 0.179 (59,368.57 <br />Met acquisition cost f288,882.ffi <br />- --------- Adjusted Ornership E Overhaul Costs ---------~------------- Adjusted Operatirq Costs ----- ------~ <br /> <br />Acqui sitian cost (13.74 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/. <br />Eton. life -Dozer i ROPS (17.40 N/A N/A f5.87 f14. TS (6.51 f11.85 N/A N/A N/A N/. <br />-Attach. f2 M/A N/A N/A (0.00 (0.00 50.00 (0.00 N/A N/A N/A N/, <br />Amual usage (19.02 (12.27 f9.03 N/A N/A M/A N/A N/A N/A N/A N/. <br />Double shifts 514.27 (6.14 f4.51 N/A N/A N/A N/A N/A x/A N/A N/, <br />Triple shifts (12.69 (4.09 (3.01 N/A N/A N/A N/A M/A N/A N/A N/. <br />Mech.labor-DOZer d ROPS M/A N/A N/A (5.04 N/A (5.59 N/A N/A N/A N/A N/. <br />-Attach. /2 N/A N/A N/A (0.00 N/A (0.00 N/A N/A N/A N/A N/. <br />Fuel/lobe -Dozer i ROPS N/A N/A N/A N/A N/A M/A N/A f9.91 (3.25 (0.00 f1.5~ <br />-Attach. /2 N/A N/A N/A N/A N/A N/A M/A (0.00 (0.00 f0.00 f0.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.