Laserfiche WebLink
<br />Colorado Divtslon of Minerals and Geology sheet 1 of 2 <br />ESTIMATING FORM EDU[PMEMT MOBILIZATION / DEMOB)L1211TIp1 <br />Task M... 7 Prep. W JD Fileneme..M247.7 <br />Date..... 03-Dec-% Permit / N-77-247 Mine......Cosldele quarry <br />Permit Aettan........ Flnsl Retlamttan <br />Task Deaeriptlon..... MaWdemob Equipment <br />NWRLY EWIPMEMT COST <br />__=__~__________--__= MOTE - Thie is a list to aeleet from, rot a list of mrdstory Item to irclude. <br />Mab/Demob Ems. -Tractor 6xb, 75,000 lb GW, 375 XP, diesel paeered <br />-Lt. Trailer 25 tan foldiro gooseneck, drop deck <br />-Med. Trailer : 50 tan folding gooseneck, drop deck <br />-NVy. Trailer 120 Ton folding gooseneck, drop deck <br />-Pilot Car On-h ighuay light duty truck, 4x2, 130 hp, 1/2 tan rating, gasoline powered <br />-Xyd. Crane Grove RT58D rough terrain hydraulic crane, 20 tan eepaelty, 125 hp, 60 ft. boas <br />-Fuel Truck : 6x4, 3,600 pellet capacity, 210 XP, diesel powered <br />-Elbe Truck 6x4, 2,500 gallon capacity, 210 XP, diesel powered <br />-Flatbed Truck: 20,000 lb GW, 175 HP, diesel powered <br />dat <br />Las[ U - <br />p <br />e: <br />Decea4xr, 1994 <br />Lt. Riq Med.Riq Nvy.Rig Pilot Xydrsulle Fuel Lube Flatbed <br />Cost Breakdown: <=25 T. 26-50 T. > 50 T. Car Crane Truck Truck Truck <br />_3 ~ ~ ~ _~~ <br />Orsrerehip Cost/hr = (27.88 (31.23 (38.36 f1.81 f19.89 f6.95 f12.79 f5.71 <br />Operating Cost/hr = (26.84 (29.29 f34.27 55.12 f23.f0 f18.53 (24.52 f8.00 <br />operator Cost/hr = (21.40 (22.03 (22.03 (21.24 f20.86 (21.24 (21.24 (21.24 <br />Nelper Cost/hr = (20.60 (21.24 (21.26 f0.00 (0.00 50.00 (0.00 (0.00 <br />Total = f%.72 (103.79 5115.90 (28.17 564.15 (46.72 (58.55 (34.95 <br />MOM-ROADABLE ECUIPMENT: <br /> Heigh[ Ownership Haul Rip Fleet Size Haul Trip Return Trip DOT Permit <br />Machine Description (tors) Cost/hr Cost/hr (ro. hauled) Cost/hr Cost/hr Cost/ea <br /> <br />Cet D8M 35.30 f40.32 5103.79 1 (144.11 (103.79 <br />Cat 950 Yheel loader i seeding 27.01 538.62 (103.79 1 !142.41 f103.79 <br />Subtotals 5286.52 2207.58 50.00 <br />