My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL47003
DRMS
>
Back File Migration
>
General Documents
>
GENERAL47003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:21:35 PM
Creation date
11/23/2007 3:03:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
General Documents
Doc Date
8/28/1996
Doc Name
CRESSON PROJECT PERMIT M-80-244 PROCEDURES AND MATERIALS FOR 1996 CONSTRUCTION DRAIN COVER FILL THIC
From
CRIPPLE CREEK & VICTOR GOLD MINING CO
To
DNR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />As you know, there are no lazger trucks than these side dump units used by Ames on this site <br />at present. The tractor-trailer side dump unit is used for all hauling of Drain Cover Fill and <br />Low Volume Solution Collection System Fill. If lazger (heavier} equipment were to be used, <br />CC&V would again require a minimum five-foot thickness until another equipment-specific <br />reassessment of the thickness were preformed in consultation with the OMLR. <br />The current reassessment demonstrates that the same protection afforded the upper geomembrane <br />using five feet of Drain Cover Fill or five feet of Low Volume Solution Collection System Fill <br />under loaded 773Bs is provided by a three and one-half (3.5) feet roadway under the side dump <br />tractor trailer units. To develop this reassessment, one of these Ames units was loaded with <br />material and each axle unit weighed at a commercial scale. The drive axle unit, with eight tires, <br />was the heaviest. Therefore, its weight was used in the computations. <br />The Attachment, prepared by Golder Associates, presents the computations for both the 773Bs <br />and the side dump tractor trailer units. <br />CC&V would appreciate your review of this information which confirms the appropriateness of <br />using 3.5 feet of Drain Cover Fill or Low Volume Solution Collection System Fill on the haul <br />truck roadways based on providing the same, and, therefore, adequate, factor of safety as <br />achieved with five feet and the larger equipment. We wish to implement this equipment-specific <br />thickness as soon as possible because it will expedite covering of the liner. Thus, our request <br />to receive your acknowledgement as rapidly as possible. <br />Thank you for your assistance. <br />E. <br />Environmental Affairs <br />Attachment: a/s <br />FILE: CC&VSTIP.006 <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.