<br />Technical Revision No. 16 was submitted on October 23, 1989 and was approved <br />on December 11, 1989. Coal handling facilities were modified. Bond was <br />increased by $13,793.00. <br />Technical Revision No. 17 was submitted on December 18, 1989 and was withdrawn <br />on January 2, 1990. <br />Technical Revision No. 18 was submitted on December 22, 1989 and was approved <br />on January 3, 1990. It involved the installation of a temporary truck dump <br />and conveyor. Bond increased by $2360.00. <br />Minor Revision No. 27 was submitted on December 28, 1989 and was approved on <br />January 12, 1990. Aside drainage culvert was constructed on the refuse <br />disposal area. <br />Minor Revision No. 28 was submitted on January 23, 1990 and was approved on <br />January 25, 1990. This involved the construction of a compressor room <br />addition to the plant. Bond increased by $403.00. <br />Minor Revision No. 29 was submitted on March 8, 1990 and was approved on <br />March 9, 1990. A topsoil stockpile and drainage crossing were constructed. <br />Minor Revision No. 30 was submitted March 23, 1990 and was approved <br />March 27, 1990. A coal stockpile was constructed. <br />Technical Revision No. 19 was submitted on February 15, 1990 and was approved <br />April 23, 1990. The waste water collection system was upgraded. <br />Minor Revision No. 31 was submitted on May 10, 1990 and was approved on <br />May 10, 1990. It involved the removal of oil storage tanks and reclamation of <br />the site, as well as the addition of a magnesium chloride storage tank. <br />Stipulation No. 45 required permit updating. <br />Minor Revision No. 32 was submitted on June 19, 1990 and was approved <br />June 25, 1990. A pump system was installed between pond 007 and the <br />preparation plant thickener. Bond increased $250.00. <br />Minor Revision No. 33 was submitted on August 23, 1990 and was approved <br />August 27, 1990. It involved the construction of a north addition to the <br />preparation plant. Bond increased $628.80. <br />Technical Revision No. 20 was submitted on July 16, 1990 and was approved on <br />September 6, 1990. This was a discontinuation of the annual mine inflow <br />monitoring due to mine portal sealing. <br />Minor Revision No. 34 was submitted On September 21, 1990 and was approved on <br />October 1, 1990. This involved the installation of a small sewage treatment <br />plant. Bond increased by $696.00. <br />Minor Revision No. 35 was submitted on October 24, 1990 and was approved on <br />October 24, 1990. A culvert was installed in ditch D-32. Map 13 was required <br />to be updated. <br />5- <br />