Laserfiche WebLink
concentrations. Project safety is of utmost importance, and any <br />work deemed unsafe by the PROJECT MANAGER shall be halted <br />immediately without prejudice. <br />Work shall not proceed in Section 24 if only one person is on site. <br />A minimum of two persons will be required on site for work to <br />proceed. Workers should use the "buddy system" for checking on the <br />safety of others and knowing their locations at all times. <br />Men working around or over the fire area shall be under observation <br />by other personnel, or shall be in radio contact with other workers <br />on the project. ._ <br />Required Equipment <br />Rope <br />The CONTRACTOR shall have a minimum of 50 linear feet of rope at the <br />site. The rope shall contain no nylon, polypropylene or other <br />plastic materials. <br />Fire Equipment <br />An ABC fire extinguisher with a 25-pound capacity shall be available <br />on site. In addition, shovels, blankets, buckets and a minimum of <br />100 gallons of water shall be on site to fight brush fires which may <br />start due to project work. <br />Radios <br />At least two walkie-talkies shall be on site, properly working and <br />in use by crew members working in different parts of the project <br />area. The radios shall have a minimum rated range of one <br />quarter-mile. <br />Vehicles <br />A motor vehicle shall be available to any crew working on the site. <br />TASK 1. <br />MOBILIZATION/DEMOBILIZATION <br />DESCRIPTION <br />This specification covers the CONTRACTOR'S operations for: <br />a. Payment of premiums for bonds and insurance acquired <br />specifically for the construction of this project, including <br />premiums for performance and payment bonds; <br />-6- <br />