My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL45835
DRMS
>
Back File Migration
>
General Documents
>
GENERAL45835
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:16:14 PM
Creation date
11/23/2007 2:08:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981037
IBM Index Class Name
General Documents
Doc Date
7/19/1993
Doc Name
INVITATION & BID
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT SCHEDIILE AND PRE-CONSTRIICTION REQIIIREMENTS <br />The project is scheduled for construction between September 16, and <br />October 23, 1993. A schedule of work items to be completed within <br />this time period must be submitted to the PROJECT MANAGER for <br />approval prior to the start of construction. The project schedule <br />shall show time lines of major activities and Bid items, and shall <br />demonstrate the CONTRACTOR'S ability to complete the project within <br />the allotted time. <br />TIME OF COMPLETION <br />The time of completion allowed for the project is 37 calendar days <br />after receipt of the Notice to Proceed. Inspection points shall not <br />be completed on weekend days without prior authorization of the <br />PROJECT MANAGER. <br />LIQIIIDATED DAMAGES <br />The liquidated damages for this project will be $300 per day. <br />Please see "General Conditions", Numbers 9 and 10. <br />BID BOND <br />A bid bond is required for this job. Please see the "General <br />Conditions", Number 4. <br />PERFORMANCE BOND AND LABOR AND MATERIALS PAYMENT BOND <br />A performance bond and a labor and materials payment bond are <br />required for this job. Please see the "General Conditions" Number <br />6. <br />THREE WAY AGREEMENT AND INSIIRANCE <br />A three-way "Agreement for Reclamation Activities" is not required <br />for this job. Please see Number 5 of "General Conditions" for the <br />applicable insurance requirements. <br />MINORITY/WOMEN BIISINE88 PARTICIPATION <br />The successful bidder is required to complete and return the <br />attached Minority (MBE)/Women (WBE) Business Participation form <br />before a Purchase Order is issued. <br />LIST OF EQIIIPMENT OFFERED <br />The "List of Equipment Offered" form must be returned with each bid. <br />All equipment to be used on the project must be listed. The <br />CONTRACTOR must own, have a current lease for the equipment intended <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.