My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL45835
DRMS
>
Back File Migration
>
General Documents
>
GENERAL45835
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:16:14 PM
Creation date
11/23/2007 2:08:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981037
IBM Index Class Name
General Documents
Doc Date
7/19/1993
Doc Name
INVITATION & BID
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXECUTION <br />The CONTRACTOR shall give the PROJECT MANAGER at least two (2) days <br />notice of the time and place of starting his revegetation operations <br />and shall continue to advise as to the schedule of operations. <br />Revegetation may take place at the completion of the work at an <br />individual site if the CONTRACTOR so desires. <br />Immediately prior to seedbed preparation, fertilizer shall be <br />uniformly applied over the areas designated for seeding, and <br />immediately incorporated into the soil by tillage methods as <br />discussed below. ._ <br />Commercial Fertilizer Commercial fertilizer shall be commercial <br />grade diammonium phosphate (18-46-0) and free flowing, suitable for <br />application with hydraulic or pneumatic type equipment or fertilizer <br />spreaders and conforming to applicable Colorado State Fertilizer <br />laws. Caked or lumpy fertilizer will not be accepted. The <br />CONTRACTOR shall furnish a supplier's certificate of analysis and <br />weight. All fertilizer shall be in a form readily available to <br />plants. Commercial fertilizer shall be applied at a rate of 200 <br />pounds per acre. <br />Seedbed Preparation The seedbed shall be firm. Miscellaneous <br />mining debris, trash, weeds, and other debris that will interfere <br />with seeding operations shall be removed or disposed of as approved <br />by the PROJECT MANAGER. Areas that are tilled or gullied shall be <br />smoothed to the extent that the rills and gullies blend with <br />adjoining surfaces. <br />On sites where equipment can operate, the seedbed shall be <br />adequately loosened (4 to 6 inches deep) and smoothed. Chiseling, <br />discing, harrowing, or cultipacking may be required. Work shall be <br />done on the contour where practicable. Slopes too steep for the <br />above operations shall be tracked up and down slope with a crawler <br />tractor. <br />On sites where equipment cannot operate, the seedbed shall be hand <br />raked or otherwise prepared by hand by scarifying to a minimum depth <br />of one (1) inch to provide a roughened surface so that seed will <br />stay in place. <br />Seedbed preparation shall be suspended when soil moisture conditions <br />are not suitable for the preparation of a satisfactory seedbed as <br />determined by the PROJECT MANAGER. <br />Seed Mixtures The CONTRACTOR shall be required to supply the seed. <br />The seed mixture designated below shall be uniformly sown over the <br />areas to be vegetated at the minimum rates per acre indicated below. <br />Seeding shall not be done if the ground is frozen. All rates are <br />-18- <br />
The URL can be used to link to this page
Your browser does not support the video tag.