My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL45266
DRMS
>
Back File Migration
>
General Documents
>
GENERAL45266
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:14:14 PM
Creation date
11/23/2007 1:40:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981016
IBM Index Class Name
General Documents
Doc Date
9/29/1993
Doc Name
INVITATION & BID - silo area reclaim
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
listed and the owner identified. A purchase order contract will not be awarded to a bidder <br />who in the opinion of the OWNER (a) does not have adequate equipment, or (b) does not <br />have firm and satisfactory arrangements to obtain adequate equipment to perform the work <br />described in the Invitation and Bid. <br />Project Funding <br />The Hawk's Nest Mine, Permit Number C-81-016, was a permitted underground coal mine, <br />for which the permit was revoked in 1989 and the bond forfeited. Funding to complete the <br />reclamation of this site will be provided from the forfeited surety and letter of credit, <br />currently administered by the Colorado Division of Minerals and Geology. <br />Utilities <br />Utilities, both underground and above ground, may exist which could affect construction <br />work covered under this contract. The CONTRACTOR is responsible for determining the <br />nature and locations of any and all utilities which could affect construction work covered <br />under this contract. The horizontal and vertical locations of utilities may vary. The <br />CONTRACTOR is responsible for excavation and equipment movement without damage <br />to utilities. The CONTRACTOR assumes all responsibility for damages to any utilities he <br />causes under this contract. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.