My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL45266
DRMS
>
Back File Migration
>
General Documents
>
GENERAL45266
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:14:14 PM
Creation date
11/23/2007 1:40:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981016
IBM Index Class Name
General Documents
Doc Date
9/29/1993
Doc Name
INVITATION & BID - silo area reclaim
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor Qualification References <br />Bidders must submit qualifications of blasting with their bid. Award will be made with <br />reasonable promptness, by written notice to the low responsive and responsible bidder <br />whose bid meets the critical set forth in Section 2 of the Invitation for bid. <br />The low bidder shall submit the items listed below reflecting experience and qualification <br />of the CONTRACTOR or intended subcontractor to perform the blasting program. The <br />CONTRACT'OR'S bid is subject to acceptance or rejection by the PROJECT MANAGER <br />based on the experience and qualifications reflected in the submitted items. These items <br />must be submitted with the bid. <br />A list of major components to be uses, such as initiation systems, explosive <br />types, drilling equipment and other critical characteristics for each item prior <br />to commencement of work. <br />2. A listing of personnel to perform the work. Personnel lists should include <br />experience and qualification of key personnel. <br />3. A reference list of similar work performed in the previous five (5) years, using <br />similar equipment and personnel. Include date, project locations, and phone <br />numbers to reference. <br />Project Start <br />The project is scheduled with a startup date of November 22, 1993. If your company cannot <br />schedule construction during this period, please do not bid on this project. A Notice of <br />Award will be sent to the apparent low responsive and responsible bidder within four (4) <br />days of the bid opening. The Division of Minerals and Geology must receive the required <br />insurance, bonds and project schedule within fourteen (14) days after the bid opening. At <br />the expiration of the fourteen days, DMG may elect to award the contract to the next lowest <br />bidder. Bidders are advised to keep in close contact with CDMG during this period. <br />Project Schedule and Pre-Construction Requirements <br />The project is scheduled for construction between November 22, and December 16, 1993. <br />A schedule for work items to be completed within this time period must be submitted to the <br />PROJECT MANAGER for approval prior to the start of construction. The project schedule <br />shall show time lines of major activities and Bid items, and shall demonstrate the <br />CONTRACT'OR'S ability to complete the project within the allotted time. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.