Laserfiche WebLink
<br />October 19, 1989, March 18, 1990 to October 10, 1990 and August 16, 1991 to August 26, 1993. <br />The mine was reclaimed in the summer of 1995. An application for Phase I Bond Release was <br />received by the Division on August 31, 1995. The Division issued a proposed decision and <br />written findings to approved the request for a Phase I bond release on December 14, 1995. <br />' Section II- History of Violations <br />A review of the inspection and enforcement activities during the first half of the permit term was <br />conducted. One enforcement action has been taken by the Division since permit renewal. <br />DATE VIOLATION DESCRIPTION OF DAT HGw <br />ISSUED NUMBER VIOLATION ABATED BA ATED <br /> <br />6/21/96 C-96-014 Failure to submit Annual Reclamation July 8, 1996 Submit the 1995 <br /> Report aM failure m make mine records Annual Reclamation <br /> immediately available to the public. Report and rile records <br /> in the Ga~eld Counry <br /> Courthouse. <br />Section III- History of Revisions <br />Subsequent to permit renewal on January 14, 1995, Eastside Coal Company has submitted and <br />obtained approval for 11 minor revisions and 6 technical revisions. <br />DATE APPROVED REVISION NUMBER DESCRIPTION OF REVISION CHANGE TO BOND <br /> LIABILITY <br />Denied 2/10/95 MR-IS Disposal of Waste Material in Underground Workings 0 <br />Denied 2110/95 MR-16 Revised Portal Seal Design 0 <br />5/3/95 MR-17 Final Mine Map 0 <br />6/2/95 MR-IS Change of Address 0 <br />9/l 1/95 MR-19 Modify Seed Mix 0 <br />7/14/95 MR-20 Revegetauon Method 0 <br />9/8/95 MR-2I Mine Warer Levet Monitoring 0 <br />10/10/95 MR-22 Soil Amendments 0 <br />l 1/14/95 MR-23 Rill & Gully Plan 0 <br />7/15/96 MR-24 Address Change 0 <br />8/12/96 MR-25 Revise Map HGP-18 0 <br />5/2/95 TR-10 Final Contours and Drainage Channel +24.280.000 <br />512/95 TR-I I Portal Sealing and Underground Waste Disposal 0 <br />512/95 TR-12 Chan a in Water Monitorin 0 <br />2 <br />