My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL45162
DRMS
>
Back File Migration
>
General Documents
>
GENERAL45162
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:13:58 PM
Creation date
11/23/2007 1:36:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984063
IBM Index Class Name
General Documents
Doc Date
7/11/1997
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
h <br />1!23/96 TR-13 Harvcy Gap Creek- Riprap Design 0 <br />4/25/96 TR-14 Ccase Subsidence Monitoring 0 <br />7/15/96 TR-IS Ccase Gcotech Well Motutoring 0 <br />Section IV- Status of Stipulations <br />The renewed permit issued in 1995 included two stipulations. Those stipulations and their status <br />are listed below; <br />UN MBER STIPULATION RO IGIN <br />DAT CONDITIONS <br />COMPLIED <br />WITH <br />I4. THE APPLICANT MUST SUBMIT AN ADDITIONAL E24,280.00 BOND ~ 5/31/95 06/12/95 <br /> WITHIN FIVE DAYS OF THE END OF THE PUBLiC COMMENT PERIOD <br /> FOR THIS SECOND PERMIT RENEWAL AS REQUIRED BY RULES 3.02.2(4) <br /> AND 2.07.4(3)(a) OR FIVE DAYS AFTER A BOARD DECISION IF A FORMAL <br /> HEARING IS REQUESTED. <br />15. THE APPLICANT SHALL ADD IRON TO THE FULL SUITE OF CHEMICAL 5/31/95 ongoing <br /> PARAMETERS ANALYZED FOR SURFACE AND GROUND WATER <br /> MONITORING IN ORDER TO BRING THE HYDROLOGIC MONITORING <br /> PLAN INTO COMPLIANCE WITH RULE 2.06.6(3)(b)(iv). <br />Section V- Variances [o the Permit <br />Rules 2.06.2, 2.06.3, 2.06.5 and 2.06.7 require that experimental practices, mountaintop removal <br />variances, variances from approximate original contour (AOC), and variances from <br />contemporaneous reclamation be reviewed by the Division where applicable during the Midterm <br />Review. There are no permit variances at the Eastside Mine involving mountaintop removal or <br />achievement of original contour, experimental practices or stream buffer practices. <br />Section VI- Decision to Require Revision <br />The following items pertain to various portions of the Eastside Mine permit which needs to be <br />revised and/or need to reflect the current status and condition of the site. Eastside Coal Company <br />should submit a revision to the permit to address all of the items below no later than September <br />1, 1997. <br />Please update the identification of interest portions of the permit as required by Rule <br />2.03.4. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.