Laserfiche WebLink
SUMMARY <br />History of the Review Process <br />Operations at the Colowyo Mine began in 1976, under CMLRD Extraction and <br />Development Permit 76-15 C/A. On November 4, 1982 permanent program permit <br />C-81-019 was approved fora five year term. <br />In accordance with Rule 2.08.5, the Division notified Colowyo of the need to <br />renew the existing permit on December 31, 1986. The application for renewal <br />was received on i4arch 16, 1987, and approved on August 21, 1987. <br />Previous analyses of Colowyo's mining and reclamation operations have included <br />the original permitting review, mid-term review, and several minor and <br />technical revision applications. The reader is directed to File No. C-81-019 <br />for further specifics on these reviews. It should be noted that the entire <br />permit was retyped for the permit renewal, so that page references in the <br />original Findings are no longer accurate. The new Table of Contents in the <br />permit application should be used to locate specific sections of the pemit. <br />The application for TR No. 14 - tdining of Section 11 was received by the <br />Division on November 18, 1988 and deemed complete on November 25, 1988. A <br />preliminary adequacy letter was sent to Colowyo on December 27, 1988. <br />Responses were received on January 17, 1989. The revision was proposed for <br />approval on January 25, 1989. <br />