My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL44742
DRMS
>
Back File Migration
>
General Documents
>
GENERAL44742
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:13:27 PM
Creation date
11/23/2007 1:16:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
General Documents
Doc Date
8/15/1991
Doc Name
STIPULATION 7 AND 8 BLUE RIBBON MINE PN C-81-047
From
MINREC INC
To
MLRD
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
#4 SEDIMENT POND CERTIFICATION <br />On February 2, 1985, Larry M. Reschke, P.E., certified the <br />construction of the #4 Sediment Pond. Mr. Reschke certified that <br />the pond was structurally sound and had the storage volume shown <br />on a drawing attached to his certification. During the 1990 mid- <br />term review for the Blue Ribbon Mine, it was noted that the #4 <br />Sediment Pond did not meet the requirements of Rule 4.05.6111)(e) <br />& (h). <br />Rule 4.05.6(11)(e) requires that the top of the settled em- <br />bankment be 1.0 foot above the water surface in the pond with the <br />emergency spillway flowing at design depth. <br />Rule 4.05.6(11)(h) requires that the <br />the embankment be no less than the quoti <br />in feet, is the height of the embankment <br />upstream toe of the embankment. For the <br />so the minimum to width of the embankment <br />8.1 feet. <br />minimum top width of <br />ent of (H+351/5 where H, <br />as measured from the <br />#4 pond, H = 5.1 feet, <br />shall not be less that <br />On August 14, 1991, maintenance work was performed on the <br />pond to bring it in to compliance with the above Rules. The pond <br />embankment was widened to a minimum top width of 9-feet. Fill <br />was placed on the top of the embankment so the top of the embank- <br />ment is at least one foot above the elevation of the top of the <br />emergency spillway. The volume of water storage in the pond was <br />not affected by this maintenance work. Some material was ex- <br />cavated from inside the pond so the sediment volume was increased <br />slightly. <br />I certify that the maintenance work performed on the #4 <br />Sediment Pond was performed under my direct supervision and that <br />to the best of my knowledge and belief the pond is structurally <br />sound and the pond is now constructed in accordance with the <br />provisions of Rule 4.05.6. <br />Jame E. ~ <br />,er..~st~~Date <br />P.E. 1921,~'v;~S E Sl0'F'p~~a <br />i c0i :,~ Gc^: ~ <br />~~ • <br />;.~~~ 1930 '*; <br />t ' ~~ <br />~•O a 'v0 <br />o ,. F.N'f~ia <br />,. / ~~~~:7,VAl ~ <br />/ J Y .1 ~ J <br />
The URL can be used to link to this page
Your browser does not support the video tag.