Laserfiche WebLink
DISCUSSION OF THE WATER BALANCE WITHIN THE MINE; AND, A PROJECTION OF <br />HYDROLOGIC IMPACTS OF MINING IN THE UPCOMING YEAR. <br />ti ulation No. 5 <br />THE APPLICANT SHALL NOT MINE MORE THAN 100,000 TONS OF COAL <br />ANNUALLY UNTIL THEY HAVE OBTAINED A REVISED AIR QUALITY PERMIT <br />FROM THE COLORADO DEPARTMENT OF HEALTH FOR THE HIGHER PRODUCTION <br />LEVEL. A COPY OF THE PERMIT MUST BE FORWARDED TO THE D[VIS[ON UPON <br />RECEIPT. <br />Stipulation No. 7 <br />TOPSOIL MUST BE ANALYZED FOR FERTILIZER ELEMENTS PRIOR TO SEEDING. IF <br />THE SOIL IS FOU14D TO BE PHOSPHOROUS DEFICIENT, PHOSPHOROUS MUST BE <br />INCORPORATED INTO THE TOPSOIL DURING THE RESPREADING PROCESS. ANY <br />OTHER FERTILIZER ELEMENTS WHICH ARE DEFICIENT IN THE TOPSOIL SHALL BE <br />ADDED AFTER O]VE YEAR'S GROWTH OF VEGETATION AT A TIME OF YEAR <br />APPROVED BY THE DIVISION. <br />Stinulation No. 12 <br />THE PERMITTEE SHALL MAINTAIN RAPTOR BUFFER ZONES ESTABLISHED FOR <br />THE MUNGER CANYON MINE BY THE U.S.F.W.S FOLLOWING COMPLETION OF THE <br />INITIAL RAPTOR SURVEY CONDUCTED IN JULY 1983. NO SURFACE <br />DISTURBANCES :>HALL OCCUR WITHIN ESTABLISHED BUFFER ZONES EXCEPT AS <br />SPECIFICALLY AUTHORIZED BY CMLRD IN CONSULTATION WITH THE U.S.F.W.S. <br />AND C.D.O.W. <br />Stinulation No. 14 <br />THE DIVISION REQUIRES GRAND VALLEY COAL COMPANY TO COMPLETE <br />APPROPRIATE WASTE SHEAR STRENGTH TESTS AND TO SUBMIT THE RESULTS OF <br />THOSE TESTS TO THE DIVISION FOR REVIEW AND APPROVAL, IMMEDIATELY <br />FOLLOWING THE AVAILABILITY OF REPRESENTATIVE COAL PROCESSING WASTE <br />REFUSE MATERIALS. IF SIGNIFICANT MATERIAL STRENGTH VARIATION OCCURS <br />BETWEEN THE ACTUAL TEST RESULTS AND THOSE VALUES ASSUMED IN <br />COMPLETING THE STABILITY ANALYSIS INCLUDED WITHIN THE AMENDED <br />PERMIT REVISION) APPLICATION, THE DIVISION WILL REQUIRE GRAND VALLEY <br />TO COMPLETE AivIENDED STABILITY ANALYSIS AND DESIGN REVISION TO THE <br />WASTE PILE PLA]v. <br />