My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL44507
DRMS
>
Back File Migration
>
General Documents
>
GENERAL44507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:13:16 PM
Creation date
11/23/2007 1:06:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981037
IBM Index Class Name
General Documents
Doc Date
6/3/1983
Doc Name
PHASE II RECLAMATION BONDING ADJUSTMENTS
From
GEC MINERALS INC
To
MLRD
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Carol Russell <br />MLRD <br />Bonding Adjustments cont. <br />Page 3 <br />to serve GEC's operating purpose). Accordingly, the proposed back- <br />filling can be evaluated as follows: <br />Existing Pit around Section 12 Area <br />Volume (Sec. 12) = 13,333 C.Y. after the width of the haul <br />road is reduced to 22': <br />Volume (Sec. 12) = 22 + 60 ) X 16 X 450' = 10,933 C.Y. <br />Total yardage to be backfilled = 13,333 - 10,933 = 2,400 C.Y, <br />Existing Pit around Section 11 Area <br />Volume (Sec. 11) = 5,926 C.Y, after the width of the haul <br />road is reduced to 22': <br />Volume (Sec. 11) _ (22' + 60') X 16' X 200' = 4,859 C.Y. <br />Total yardage to be backfilled = 5,926 - 4,859 = 1,067 C.Y. <br />Existing Pit around Section 10 Area <br />Volume (Sec. 10) = 13,600 C.Y. after the width of the haul <br />road is reduced to 22'; <br />Volume (Sec. 10) _ (22 + 8~') X 36' X 150' = 10,400 C.Y. <br />Total yardage to be backfilled = 13,600 - 10,400 = 3,200 C.Y, <br />Existing Pit around Section 9 Area <br />Volume (Sec. 9) = 36,644 C.Y. after the width of the haul <br />road is reduced to 22': <br />Volume (Sec. 9) _ (22' + 11~') X 100' X 102' = 26,25b C.Y. <br />Total yardage to be backfilled = 36,644 - 26,256 = 10,388 C.Y. <br />Existing Pit around ~ of Section 8 Area <br />Volume (Sec 8) = 18,322 C.Y. <br />Volume (Sec. 8)= (22' + 134' <br />after the width of the haul <br />road is reduced to 22': <br />X 89 X 48 = 12,341 C.Y. <br />Total yardage to be backfilled = 18,322 - 12,341 = 5,981 C.Y. <br />
The URL can be used to link to this page
Your browser does not support the video tag.