My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL44507
DRMS
>
Back File Migration
>
General Documents
>
GENERAL44507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:13:16 PM
Creation date
11/23/2007 1:06:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981037
IBM Index Class Name
General Documents
Doc Date
6/3/1983
Doc Name
PHASE II RECLAMATION BONDING ADJUSTMENTS
From
GEC MINERALS INC
To
MLRD
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br />MLRD <br />Bonding Adjustments cont. <br />Page 4 <br />Carol Russell <br />Based on this plan, by the time the ramp of the haul road reaches <br />the middle between Sec. 9 and Sec. 8, a total of 23,036 C.Y. of <br />overburden/interburden material has been already backfilled, which <br />was way over the 17,732 C.Y. of backfilling to be carried out for <br />this specific purpose. <br />The following are the details of the plans, which GEC Minerals, Inc. <br />proposes to carry out as soon as possible. <br />Description Initiation Date Deadline <br />Sout Portion ONLY <br />Prospecting Pit Immediately July 15, 1983 <br />The South portion of the pit has been backfilled,and graded. All the <br />remaining work is re-seeding, (seeds have been ordered). As soon as <br />the seeds are available, this work can be done in a week. The final <br />top four (4) feet of backfilling will be carried out by GEC as soon <br />as Dorchester finishes their backfilling (North Portion). <br />Backfilling Existing Pit June 10, 1983 August 10, 1983 <br />Currently, GEC has been using open pit and auger alternative method for <br />the 5th Seam operation. The backfilling cannot be carried out until the <br />open pit mining starts, which will be June 10, 1983. According to the <br />above calculation, prior to August 10, a total of more than 17,732 C.Y. <br />of material can be backfilled as planned. <br />GEC Minerals, Inc. appreciates the opportunity to wo <br />rado Mined Land Reclamation Division in a productive <br />that the extra reclamation work to exchange for the <br />amount can be accepted by the CMLRD. Please call us <br />questions regarding this submission. <br />Ve_ rye truly ors, <br />L.K. Chen <br />VP-Engineering/Mine Planning <br />LKC:deMc <br />Enclosure <br />rk with the Colo- <br />manner and hopes <br />additional bonding <br />if you have any <br />
The URL can be used to link to this page
Your browser does not support the video tag.