My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL44507
DRMS
>
Back File Migration
>
General Documents
>
GENERAL44507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:13:16 PM
Creation date
11/23/2007 1:06:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981037
IBM Index Class Name
General Documents
Doc Date
6/3/1983
Doc Name
PHASE II RECLAMATION BONDING ADJUSTMENTS
From
GEC MINERALS INC
To
MLRD
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Carol Russell <br />MLRD <br />Bonding Adjustments cont. <br />Page 2 <br />Description Volume C.Y. Bonding ($) $/C.Y. <br />Extra (volume/Bonding required: <br />-3C~3'~ $300,892 <br />142,00 ' -119,280 <br />71 -221,736 <br />49,193 41,322 0.84 <br />Therefore, GEC Minerals, Inc. is legally responsible for additional <br />reclamation bond up to $41,322 as calculated above. <br />However, owing to GEC Minerals, Inc. present financial situation, which <br />would not allow GEC to perform such bonding as indicated, GEC would rather <br />propose to carry out additional reclamation work, which would equalize the <br />value of bonding or yardage in compensation of this requirement. <br />The following is the status of GEC's current Bonding Information directly <br />related to the accomplishment of GEC's reclamation work: <br />Bonding to be deducted Bonding ($) Remarks - <br />Maintenance Shop Area $ 346 -Maintenance Shop never <br />has been built & will <br />not be built in the <br />near future. <br />Orphan Pit <br />90% X $13,949 <br />Prospecting Pit <br />12,554 -Backfilling <br />70% X $10,340 7,238 -Backfilling, Newlin <br />Creek reconstruction <br />70% X $600.3 420 -Regrading, topsoiling <br />Total: $20,212 <br />Total actual reclamation bonding amount will be $41,322 - $20,212(to be <br />deducted) _ $21,110 or 17,732 cubic yards backfilling reclamation work. <br />According to GEC existing pit, if the backfilling can be carried out along <br />both sides of the haul road to reduce the haul road to 22 feet wide from <br />the North end down to the bottom - 5th Seam (because this is the sole <br />access road to operate the pit, therefore, this haul road shall be remained <br />open until the entire 5th Seam is mined out, and 22 feet will be adequate <br />
The URL can be used to link to this page
Your browser does not support the video tag.