My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL44414
DRMS
>
Back File Migration
>
General Documents
>
GENERAL44414
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:13:12 PM
Creation date
11/23/2007 1:00:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982055
IBM Index Class Name
General Documents
Doc Date
8/16/1982
Doc Name
Proposed Decision & Findings of Compliance for the Animas Mine
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-q_ • <br />Stipulation No. 9: <br />WITHIN 90 DAYS OF PERMIT ISSUANCE, THE PERMITTEE SHALL <br />PROVIDE THE FOLLOWING: <br />1. ASITE-SPECIFIC REVEGETA TION PLAN WHICH ADDRESSES AT A 1dINIMUM <br />THE FOLLAWING: R SCHEDULE FOR REVEGETATION, SEED MIXES TO BE <br />USED AT THE SITE FOR REVEGETATION, TOPSOIL STABILIZATION, <br />EMBANKMENT SEEDING AND OTHER APPLICATION, PLANTING AND SEEDING <br />METHODS, MULCHING TECHNIQUES, IRRIGATION MEASURES, RND <br />PEST AND DISEASE CONTROL MEASURES. <br />2. MEASURES TO BE USED TO DETERMINE THE SUCCESS OF REVEGETATZON <br />IN ACCORDANCE WITH RULE 4.15.7 AND 4.15.8, TO INCLUDE, BUT NOT <br />BE LIMITED TO: METHODOLOGIES EMPLOYED TO MEASURE SUCCESS, <br />STANDARDS FOR COVER, PRODUCTIVITY, WOODY PLANT DENSITY, RND <br />SPECIES DIVERSITY, AND A GRAZING MANAGEMENT PLAN. <br />Stipulation No. 10: <br />WITHIN 30 DAYS AFTER PRODUCTION OF THE FIRST COAL PROCESSING WASTE, <br />THE MATERIAL MUST BE ANALYZED TO ACCURATELY DETERMINE THE PARAMETERS <br />USED ZN THE STABILITY ANALYSIS, AND THE RESULTS OF THE ANALYSIS <br />MUST BE SUBMITTED TO THE DIVISION. IF THE RESULTS OF THE ANALYSIS <br />NECESSITATE A CHANGE IN THE COAL PROCESSING WASTE EMBANKMENT DESIGN, <br />APPROPRIATE CHANGES 1fUST BE INCORPORATED INTO THE FINAL DESIGN. <br />Stipulation No, ll: <br />WITHIN 30 DAYS OF PERMIT ISSUANCE, BUT PRIOR TO THE DISPOSAL OF ANY <br />COAL PROCESSING WASTE PRODUCED BY THE OPERATION, THE PERMITTEE <br />MUST DEMONSTRATE, TO THE SATISFACTION OF THE DIVISION, THAT ENOUGH <br />NON-TOXIC lATERIAL IS AVAIL~IBLE TO THE PERMITTEE TO PROVIDE AT LEAST <br />FOUR FEET OF COVER OVER TXE PERMANENT COAL PROCESSING WASTE PILE <br />FOLLOWING CONSTRUCTION OF THE PILE. <br />Stipulation No. Z2: <br />WITHIN 30 DAYS AFTER PRODUCTION OF THE FIRST COAL PROCESSING WASTE, <br />THE MATERIAL MUST BE SAMPLED AND ANALYZED FOR GEOCHEMICAL CHARACTER- <br />ISTICS. THIS ANALYSIS WILL INCLUDE THE FULL SUITE OF PARAMETERS WHICH <br />IS REQUIRED BY THE DIVISION AT THAT TIME, AS SPECIFIED IN CURRENT <br />DIVISION GUIDELINES FOR ROOF AND FLOOR CHEMICAL PARAMETERS. AFTER <br />6 MONTHS FROM THE INITIAL SAMPLING, NEW COAL PROCESSING WASTE WILL <br />BE SAMPLED AND ANALYZED FOR THE APPROPRIATE PARAMETERS. RLL <br />ANALYSES WILL BE SUBMITTED TO THE DZVTSION WITHIN 30 DRYS OF SAMPLING. <br />
The URL can be used to link to this page
Your browser does not support the video tag.