Laserfiche WebLink
-q_ • <br />Stipulation No. 9: <br />WITHIN 90 DAYS OF PERMIT ISSUANCE, THE PERMITTEE SHALL <br />PROVIDE THE FOLLOWING: <br />1. ASITE-SPECIFIC REVEGETA TION PLAN WHICH ADDRESSES AT A 1dINIMUM <br />THE FOLLAWING: R SCHEDULE FOR REVEGETATION, SEED MIXES TO BE <br />USED AT THE SITE FOR REVEGETATION, TOPSOIL STABILIZATION, <br />EMBANKMENT SEEDING AND OTHER APPLICATION, PLANTING AND SEEDING <br />METHODS, MULCHING TECHNIQUES, IRRIGATION MEASURES, RND <br />PEST AND DISEASE CONTROL MEASURES. <br />2. MEASURES TO BE USED TO DETERMINE THE SUCCESS OF REVEGETATZON <br />IN ACCORDANCE WITH RULE 4.15.7 AND 4.15.8, TO INCLUDE, BUT NOT <br />BE LIMITED TO: METHODOLOGIES EMPLOYED TO MEASURE SUCCESS, <br />STANDARDS FOR COVER, PRODUCTIVITY, WOODY PLANT DENSITY, RND <br />SPECIES DIVERSITY, AND A GRAZING MANAGEMENT PLAN. <br />Stipulation No. 10: <br />WITHIN 30 DAYS AFTER PRODUCTION OF THE FIRST COAL PROCESSING WASTE, <br />THE MATERIAL MUST BE ANALYZED TO ACCURATELY DETERMINE THE PARAMETERS <br />USED ZN THE STABILITY ANALYSIS, AND THE RESULTS OF THE ANALYSIS <br />MUST BE SUBMITTED TO THE DIVISION. IF THE RESULTS OF THE ANALYSIS <br />NECESSITATE A CHANGE IN THE COAL PROCESSING WASTE EMBANKMENT DESIGN, <br />APPROPRIATE CHANGES 1fUST BE INCORPORATED INTO THE FINAL DESIGN. <br />Stipulation No, ll: <br />WITHIN 30 DAYS OF PERMIT ISSUANCE, BUT PRIOR TO THE DISPOSAL OF ANY <br />COAL PROCESSING WASTE PRODUCED BY THE OPERATION, THE PERMITTEE <br />MUST DEMONSTRATE, TO THE SATISFACTION OF THE DIVISION, THAT ENOUGH <br />NON-TOXIC lATERIAL IS AVAIL~IBLE TO THE PERMITTEE TO PROVIDE AT LEAST <br />FOUR FEET OF COVER OVER TXE PERMANENT COAL PROCESSING WASTE PILE <br />FOLLOWING CONSTRUCTION OF THE PILE. <br />Stipulation No. Z2: <br />WITHIN 30 DAYS AFTER PRODUCTION OF THE FIRST COAL PROCESSING WASTE, <br />THE MATERIAL MUST BE SAMPLED AND ANALYZED FOR GEOCHEMICAL CHARACTER- <br />ISTICS. THIS ANALYSIS WILL INCLUDE THE FULL SUITE OF PARAMETERS WHICH <br />IS REQUIRED BY THE DIVISION AT THAT TIME, AS SPECIFIED IN CURRENT <br />DIVISION GUIDELINES FOR ROOF AND FLOOR CHEMICAL PARAMETERS. AFTER <br />6 MONTHS FROM THE INITIAL SAMPLING, NEW COAL PROCESSING WASTE WILL <br />BE SAMPLED AND ANALYZED FOR THE APPROPRIATE PARAMETERS. RLL <br />ANALYSES WILL BE SUBMITTED TO THE DZVTSION WITHIN 30 DRYS OF SAMPLING. <br />