Laserfiche WebLink
-5- <br />Stipulation No. 13: <br />PRIOR TO PLACEMENT OF ANY WASTE MATERIAL, THE PERI4ITTEE MUST DEVELOP <br />THE COAL DEVELOPMENT WASTE PILE MONITORING WELLS RS PROPOSED IN THE <br />GRO[J17D WATER l90NITORING PLAN ZN THE PERMIT APPLICATION. IN THE <br />PROCESS OF DEVELOPING THESE WELLS, THE APPLICANT 19fIST 1) VERIFY <br />DEPTH TO BEDROCK, 2J DETERMINE THE TYPE AND STABILITY OF THE BEDROCK, <br />AND 3) DETERMINE THE DEPTH AND QUALITY OF RNY GROUND WATER ENCOUNTERED <br />ZN THE WELLS. ADDITIONALLY, THESE WELLS MUST BE CASED AND l90NITORED <br />MONTHLY FOR GROUND WATER LEVELS. IF GROUND WATER IS PRESENT, SAMPLES <br />MUST BE TAKEN QUARTERLY AND ANALYZED FOR THOSE PARAh1ETER5 REQUIRED BY <br />THE DIVISION AS SPECIFIED IN CURRENT DIVISION GUIDELINES FOR• GROUND <br />WATER QUALITY PARAMETERS. RESULTS OF ALL INVESTIGATIONS AND ANALYSES <br />MUST BE SUBMITTED TO THE DIVISION ZN A TIMELY MANNER. <br />Explanations of the stipulations can be found in the Findings part of this <br />package. <br />The permit cannot be issued until all statutory notice and public comment <br />requirements have been satisfied. <br />