My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL44387
DRMS
>
Back File Migration
>
General Documents
>
GENERAL44387
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:13:09 PM
Creation date
11/23/2007 12:59:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
General Documents
Doc Date
9/18/2003
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Marr Strip Mine produced coal from the Sudduth seam with a tnzck-and-shovel operation. <br />Coal was extracted from two pits, the 720 Pit and Pit 1. Coal extraction from the 720 Pit ceased <br />in 1983 and from Pit 1 in 1993. Total disturbed lands at the Marr Strip Mine were 389.7 acres <br />according to the 2002 Annual Reclamation Report (ARR). As described in the 2002 ARR, the <br />following table summarizes the total disturbance at the Man Mine and loadout. The lands <br />included in this table are categorized by current use and/or state of reclamation. <br />Mine Area <br />Revegetated 1999 6.5 <br />Facilities, Roads and Sediment Control 34.6 <br />Topsoil stockpiles 3.3 <br />Reclaimed pre-1999 (Mart Pit, Pit 1 and 720 Pit) 345.3 <br />Total 389.7 <br />Loadout Area <br />Revegetated 1999 5.3 <br />Facilities, Roads, and Sediment Control 6.4 <br />Total 11.7 <br />Active mining operations and related activities were suspended and final reclamation activities <br />were initiated at the end of January 1993. Final backfilling, regrading, topsoiling, and mulch <br />crop seeding of the major remaining disturbance areas including the Pit 1 azea and road and pond <br />areas were completed during 1995. Final reclamation seeding of these areas, minor <br />supplemental drainage protection work, and revegetation success evaluations were completed <br />during 1996. Site activities during 1997 were limited to required site inspection and <br />maintenance including routine cleaning of ditches and culverts and spraying for noxious weed <br />control. <br />During the active operations coal was trucked to the Kerr tipple, south of Walden, where it was <br />stockpiled, crushed, screened, and loaded out. The facility was constructed on fill in the <br />wetlands of the Illinois River and encompasses approximately 12 acres. The adjacent rail lines <br />were pulled out by the railroad company in June 1996. Most of the coal stockpiled at the loadout <br />was removed in September 1996. In 1998, Ken Coal Company dismantled some of the <br />buildings at the loadout. Approximately 3,000 cubic yards of remaining coal and coal fines <br />remain were hauled to the mine site and buried. The reclamation for the loadout area <br />(backfilling and grading) was completed in 1999. <br />During 2002, Energy Fuels Coal, Inc. coordinated with the Division, the Bureau of Land <br />Management (BLM), and the Office of Surface Mining to identify, plug, seal, and reclaim a <br />number of old exploration boreholes and alluvial monitoring wells, located primarily in the Ken <br />North Area north of County Road 12E. This work was completed in October 2002, 25 bedrock <br />wells and 20 alluvial wells were successfirlly sealed and reclaimed on lands drilled by the Ken <br />Coal Company. <br />
The URL can be used to link to this page
Your browser does not support the video tag.