Laserfiche WebLink
OPERATOR SHALL SUBMIT APPROPRIATE GEOTECHNICAL STABILITY ANALYSIS TO DEMONSTRATE <br />COMPLIANCE WITH THE STABILITY REQUIREMENTS OF RULES 4.03.2(3)(C)(I) OR (D)(VIII~; OR IN THE <br />ALTERNATIVE, THE OPERATOR SHALL SUBMIT A PROPOSED RECLAIMED CONFIGURATION WITH APPROPRIATE <br />STABILITY ANALYSES TO DEMONSTRATE CONFORMANCE WITH THE REQUIREMENTS OF RULE 4.03.2(7. <br />Status: Continued, future submittal required. <br />Stipulation No. 14 <br />PEAK FLOW SHALL BE MEASURED IN MAGPIE CREEK ON A QUARTERLY BASIS AT THE CURRENT MONITORING <br />STATION. DATA ACQUIRED FROM THIS MONITORING SHALL BE SUBMITTED QUARTERLY AND INCLUDED IN <br />THE ANNUAL HYDROLOGY REPORTS FOR THE MINE. <br />Status: Continued, annual submittals required. <br />Stimulation No. 15 <br />THE OPERATOR SHALL MONITOR FLOWS IN SECOND ALKALI CREEK SO AS TO MEASURE MINIMUM AND <br />MAXIMUM FLOWS DURING EACH QUARTER FOLLOWING APPROVAL OF PERMIT REVISION NO. 1. DURING THE <br />MONITORING YEAR, AT LEAST ONE GRAB SAMPLE SHALL BE COLLECTED WHEN STREAMFLOW IS PRESENT. <br />THIS SAMPLE SHALL BE SUBMITTED FOR LAB ANALYSIS FOR TOTAL DISSOLVED SOLIDS, TOTAL SUSPENDED <br />SOLIDS, PH, TOTAL DISSOLVED IRON, AND MANGANESE. RESULTS OF THESE ANALYSES SHALL BE <br />SUBMITTED TO THE DIVISION WITHIN 60 DAYS FOLLOWING THE END OF THE FIRST MONITORING YEAR WHICH <br />ENDS ON JUNE 30, 1992. <br />Status.• Continued, annual submittals required <br />Stimulation No. 18 <br />THE APPLICANT WILL SUBMIT TO THE DIVISION AN ANNUAL REPORT OF THE INFLOWS, DISCHARGES AND <br />CONSUMPTION OF WATER WITHIN THE MINE. THIS REPORT IS TO INCLUDE A MINE WORKINGS MAP SHOWING <br />THE LOCATION AND QUANTITY OF INFLOW; A TABLE KEYED TO THE MINE MAP WHICH SHALL CONTAIN THE <br />SOURCE (LE. FAULT, FRACTURES, ETC., QUANTITY, DURATION AND QUALITY (LE., PH, ELECTRO- <br />CONDUCTIVITY AND TEMPERATURE OF ALL INFLOWS; A TABLE CONTAINING RECORDS OF WATER <br />DISCHARGED FROM THE MINE, CONSUMED IN THE MINE AND IMPORTED FOR USE WITHIN THE MINE; AND A <br />DISCUSSION OF WATER BALANCE WITHIN THE MINE. THE INFLOW STUDY IS TO BE DONE DURING THE SPRING <br />OF EACH YEAR WITH THE REPORT SUBMITTED BY AUGUST 1. <br />Status: Continued -annual submittals required. <br />Stipulation No. 24 <br />AS A COMPONENT OF THE 1994 PERMIT RENEWAL AND BOND ESTIMATE REVIEW, THE DIVISION HAS <br />DETERMINED THAT THE CURRENT EFCI RECLAMATION PLAN IS DEFICIENT IN THE FOLLOWING AREAS: <br />THE MASS BALANCE FOR THE OVERBURDEN AND TOPSOIL FOR THE FINAL REFUSE PILE <br />CONFIGURATION NEEDS TO BE CALCULATED AND IF ANY DEFICIT IS FOUND, EFCI NEEDS TO SUBMIT <br />A PLAN TO MAKE UP THE DIFFERENCE IN OVERBURDEN AND TOPSOIL. <br />