<br />-2- <br />Section III.2.2.8.11 -Ventilation Fan Housin <br /> <br />In addition to the changes to the condition and make-up of this structure that <br />were described in Amendment No. 1, a majority of the remaining steel plate <br />airway panels have been removed. Only a few plates remain and most of these <br />have been torn down. <br />Section III.2.2.6.14 -Coal Conveyor <br />This structure is still relatively intact as shown on the original drawings, <br />however a majority of the conveyor belt has been removed, as well as the steel <br />plate loading chute near the crusher building and a few of the roller <br />assemblies. The dollar amount bid for demolition and removal of this <br />structure shall be based on the current condition of the structure and not as <br />originally depicted on the drawings and exhibits. <br />Section III.2.2.6.16 - Reclaim Tunnel and Conveyor <br />Several of the roller assemblies situated along the conveyor framing near the <br />tunnel mouth have been removed. The dollar amount bid for demolition and <br />removal of this structure shall be based on it's current condition and not as <br />originally depicted in the drawings and exhibit. <br />Section III.2.2.6.17 - Loadout <br />All remaining roller assemblies along the conveyor from the mouth of the <br />reclaim tunnel to the end of the conveyor have been removed. In addition, the <br />conveyor drive motor and oxy/acetylene tanks on the loadout deck have been <br />removed. The dollar amount bid for demolition and removal of this structure <br />shall be based on it's current condition and not as originally depicted in the <br />drawings. <br />Section III.2.2.6.20 - Electrical Power and Light Poles and Wires <br />Exhibits 3B, 3C, 3D, and 3E (copies attached) have been revised to note that <br />some additional power poles and wire have been removed. The underlined <br />notations on the revised exhibits describe which poles and lines shown on the <br />original exhibits have been removed. The attached exhibits hereby replace <br />original exhibits 3B, 3C, 3D, and 3E from the October 26, 1989 Invitation and <br />Bid. <br />Section III.5.2.B - Regrading <br />The last sentence on page 2 of Amendment No. 1 under the heading "Section <br />III .5.2.6 - Regrading" that begins with the words "Payment for regrading <br />work..." is hereby changed to read: "With the exception of the excess fill <br />material stockpile, payment for regrading work will not be based on movement <br />of measured quantities, but rather for achieving the topographic contours <br />shown on Exhibits 4A and 4B. The excess fill material stockpile shall contain <br />a minimum of 4,000 cubic yards of non-coal earth fill material. Payment for <br />this portion o e regra ing work will be based on field measurements of the <br />size of the excess fill material stockpile." <br />