My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL44049
DRMS
>
Back File Migration
>
General Documents
>
GENERAL44049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:12:54 PM
Creation date
11/23/2007 12:47:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981016
IBM Index Class Name
General Documents
Doc Date
11/8/1989
Doc Name
AMENDMENT 2 TO RN-COAL-MINES-2
From
MLRD
To
ALL BIDDERS ON THE HAWKS NEST MINE WEST AREA RECLAMATION PROJECT BID NO RN-
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />-3- <br />Section III.6.2 - Ripping Execution <br />The entire specification under this section of the Invitation and Bid is <br />hereby replaced with the following specification: <br />Areas to be ripped are all located within the west mine working area limits as <br />delineated on Exhibits 3A and 36. Areas to be ripped consist of the disturbed <br />area strips on the north and south sides of the highway, beginning 5 ft. from <br />the edges of the pavement for a width of 10 ft., and all other regraded <br />surfaces or disturbed surfaces not requiring regrading which have become <br />compacted by rubber tired equipment during construction. Ripping shall be <br />done with ripper shank(s) extending a minimum of 1 ft. below the surface grade <br />with a maximum 1 ft. horizontal spacing between ripper shank penetration lines. <br />Section III.7.2.A - Culvert Removal/Modification <br />In regards to the construction of riprap lined drainage channels associated <br />with CMP-2, CMP-3, and CMP-8, an additional specification is provided in this <br />amendment as follows: <br />For each of the 3 riprap lined drainage channels to be constructed for CMP-2, <br />CMP-3, and CMP-8, the CONTRACTOR shall install a layer of geotextile fabric <br />along the excavated channel bottom and sides for the entire length of each <br />channel prior to placement of riprap. The type of geotextile fabric used <br />shall be that recommended by manufacturers for the type of channel and size of <br />riprap specified. <br />1152E/scg <br />
The URL can be used to link to this page
Your browser does not support the video tag.