Laserfiche WebLink
b. What are the hours of operation? <br />The site will be operated during daylight hours except for public/private emergencies and <br />repair and maintenance activities. The hours maybe extended for specific purposes. <br />c. What type and how many animals, if any, will be on this site? <br />There will not be any animals associated wilh this project. <br />d. What kind (type, size, weight) of vehicles will access this site and how often? <br />We do not anticipate that this site will generate additional vehicle traffic as all processing and <br />hatching will occur on the already permitted Baseline site. This site will simply provide <br />additional resource to supplement the Baseline operation. However, Hall-Irwin would like the <br />ability to import material to the Parker Dersham Resource. <br />e. Who will provide fire protection to the site? <br />Fire protection will be provided by the Brighton Fire Protection District. <br />f. What is the water source on the property? (Commercial well or water district). <br />No water will be needed for the mining operation as the material will be processed at the <br />adjacent Baseline operation. Employees will use bottled water. Refer to Exhibit G for <br />additional details about the water requirements on the property. <br />g. What is the sewage disposal system on the property? (Existing and proposed). <br />There are existing sewage disposal systems for the homes on the property. The applicant <br />will use anon-site septic system for the office/scale house antl portable restrooms for <br />employees during mining. The home and structures associated with Phase 3 will be <br />removed. <br />h. If storage or warehousing is proposed, what type of items will be stored? <br />There will not be storage or warehousing associated with this project. <br />i. Explain where storage and/or stockpile of wastes will occur on this site. <br />See attached Mining Plan Map. <br />j. Explain the proposed landscapinglscreeningtor the site. The landscaping shall be <br />separately submitted as a landscape plan map as part of the application submittal. <br />Please refer to the attached Landscape Plan Map. <br />Hall-Irwin Corporation -Parker/Dersham Resource -Weld County Use by Special Review Permit Application <br />Questionnaire - 5 <br />