Laserfiche WebLink
<br />The operator submitted an application for Phase I Bond Release on June 30, 1995. The submittal <br />was called complete by the Division on September 14, 1995. The field inspection for Phase I <br />Bond Release was held on October 24, 1995. The proposed decision is pending, as of <br />November 27, 1995. <br />This Midterm Review was due November 27, 1995. <br />SECTION H -REVISIONS TO THE PERMIT <br />The following is a sttmmary of the revisions to the permit since the Permit Renewal No. 2 <br />Findings Document dated May 5, 1993. <br /> TECHNICAL REVISIONS <br /> Bond <br />No. Subject Decision and Date Adjustment <br />5 Highwall Reclamation Plan Approved 1/28/94 None <br />6 Highwall Reclamation Plan Approved 7/28/95 None <br />7 Incidental Boundary Change Approved 5/08/95 None <br /> MINOR REVISIONS <br /> Bond <br />No. Subject Decision and Date Adjustment <br />9 Modify Reclaimed Channel Approved 10/13/93 None <br />10 Hydrology Clarifications Approved 6/19/95 None <br />11 Remove Ditch D-12 Approved 8/08/95 None <br />12 Yazd Drainage and Surface Owners Approved 9/01/95 None <br /> Information <br />SECTION III -STATUS OF STIPULATIONS <br />There are no active stipulations associated with the Apex No. 2 Mine. The only stipulation for the <br />mine was attached as a rider to Permit Renewal No. 1. An increase in the performance bond was <br />required through the stipulation. The operator submitted the new bond amount so the stipulation <br />had been complied with. <br />SECTION IV -MIDTERM ADEQUACY QUESTIONS <br />The Division has the following adequacy questions and/or cotnments. The Division would <br />appreciate a timely response. <br />2 <br />