Laserfiche WebLink
-6- <br />Stipulation No. 3 <br />THE OPERATOR SHALL CONTINUE MONITORING THE ALLUVIUM OF THE STEVENS <br />GULCH WELL FIELD. THE MONITORING WELL SHOULD BE MONITORED MONTHLY <br />FOR WATER LEVELS AND QUARTERLY FOR WATER CHEMISTRY. THE DATA <br />GATHERED FROM THE WELL SHALL BE SUBMITTED TO THE DIVISION ANNUALLY. <br />Stipulation No. 4 <br />ALL SPRINGS IN THE 5-YEAR PERMIT AREA, PERMIT REVISION AREA AND <br />ADJACENT AREA (THOSE IN SECTIONS 17, 18, and 19, T13S, R91W, AND <br />SECTION 24, T13S, R92W) SHALL BE MONITORED FOR DISCHARGES AND WATER <br />QUALITY (I.E., pH, ELECTRO-CONDUCTIVITY AND TEMPERATURE) ON A <br />QUARTERLY BASIS AS WEATHER PERMITS. THE DATA GATHERED FROM THE <br />MONITORING SHALL BE SUBMITTED TO THE DIVISION ANNUALLY. <br />Stipulation No. 5 <br />COLORADO WESTMORELAND INC. MUST SUBMIT TO THE DIVISION AND HAVE <br />APPROVED A COMPLETE TOPSOIL HANDLING PLAN FOR THE PROPOSED WASTE <br />DISPOSAL AREA PRIOR TO ANY DISTURBANCE TO THE AREA. <br />Stipulation No. 6 <br />CULORADO WESTMORELAND INC. IS DIRECTED TO CUMPLETE, AS PART OF A <br />TECHNICAL REVISION, PHASE III OF THE STABILITY ANALYSIS AND <br />REDESIGN OF THE FINAL RECLAIMED CUNFIGURATION OF THE SURFACE <br />FACILITY AREA OF THE ORCHARD VALLEY MINE, AS DESCRIBED IN THE <br />LETTER OF PROPOSAL FROM GEO-HYDRO CONSULTANTS, INC., INCLUDED <br />WITHIN VOLUME 10 OF THE ORIGINAL APPROVED PERMIT APPLICATION. THE <br />SCOPE OF PHASE III SHALL INCLUDE THE UTILIZATION OF THE FINDINGS <br />AND RECOMMENDATIONS OF PHASE II TO COMPLETE SPECIFIC ENGINEERING <br />REDESIGN ANU AMENDMENT OF THE FINAL RECLAIMED CONFIGURATION OF THE <br />SURFACE FACILITY AREA OF THE ORCHARD VALLEY MINE. THIS PROJECT <br />SHALL PROCEED IN A TIMELY FASHION TO COMPLETION BY OCTOBER 15, <br />1983. THE DIVISION SHALL BE KENT INFORMED 'dY QUARTERLY LETTER OF <br />THE PROGRESS OF THIS TASK, BY THE OPERATOR. UPON COMPLETION OF <br />PHASE III, THE RECLAMATION PLAN SHALL BE APPROPRIATELY AMENDED. <br />Stipulation No. 7 <br />COLORADO WESTMORELAND INC. IS DIRECTED TO FINALIZE THE DESIGN <br />(INCLUDING DKAINAGE DESIGNS) OF THE PROPOSED LUNG-TERM COAL <br />PROCESSING WASTE DISPOSAL STRUCTURE AT THE ORCHARD VALLEY MINE. <br />THIS DESIGN IS TO BE SUBMITTED AS A TECHNICAL REVISION PRIOR TO <br />JULY 31, 1983. PRIOR TO APPROPRIATE REVISION OF THE MINE PLAN, THE <br />OPERATOR SHALL CONTINUE PLACEMENT OF COAL PROCESSING WASTE AT THE <br />EXISTING WASTE PILE LOCATION. THE TOTAL AMOUNT OF COAL PROCESSING <br />WASTE PLACED IN THE EXISTING STRUCTURE SHALL NOT EXCEED 25,000 <br />CUBIC YARDS. FURTHERMORE, IN ADDITION TO THE INSPECTION AND <br />REPORTING REQUIREMENTS OF RULE 4.10.2, COLORADO WESTMORELAND INC. <br />SHALL SUBMIT RECORDS UR CALCULATIONSS TO VERIFY THE TOTAL <br />ACCUMULATED QUANTITY OF COAL PROCESSING WASTE DISPOSED OF AT THE <br />EXISTING SITE AS A PORTIOtJ OF ITS QUARTERLY INSPECTION REPORT TO BE <br />SUBMITTED TO THE DIVISION. <br />