Laserfiche WebLink
-7- <br />Stipulation No. 8 <br />WITHIN 90 UAYS AFTER THE COMPLETION OF PHASE III OF THE STABILITY <br />ANALYSIS AND REDESIGN OF THE FINAL RECLAIMED CONFIGURATION OF THE <br />SURFACE FACILITY AREA OF THE ORCHARD VALLEY MINE, THE APPLICANT <br />MUST SUBMIT TU THE DIVISION A REVISED BACKFILLING AND GRADING COST <br />ESTIMATED FOR THE SURFACE FACILITY AREA. IF THIS REVISED COST <br />FIGURE IS GREATER THAN THE PRESENT ESTIMATE, THE AMOUNT OF THE <br />RECLAMATION BOND WILL BE INCREASED ACCORDINGLY. <br />