Laserfiche WebLink
~~ <br />(:olorado Division of Minerals and Geology <br />ESTIMATING FORN - WHEEL LOADER WORK <br />Task #: b Prep. by: RCO Task filename M021-6 <br />Date 07/30/97 Permit #:M-81-021 Mine : Nest Sunday Mine <br />Permitting action Final Reclamation <br />Task description Spread Topsoil on Pad Areas <br />Sheet 1 of 2 <br />HOURLY EQUIPMENT LOST <br />_____________________- Basic machine: CAT 966E (199 Horsepower = 220 <br />Attachment #1: ROPS Cab Shift basis:l/day <br />(D01 050) <br />Cost Breakdown - Ownership = E27. 72 <br />-------------- - Operating-loader = E23.66 100 X utilization <br />- Operator = E22.95 <br />- Total cost/hr = E74.33 Tota( fleet cost/hr = E74.33 <br />MATERIAL QUANTITIES <br />___________________ <br />___________________ <br />Initial Swell Final <br />volume = 1,700.0 CCY factor = 1.125 volume = 1,912-5 LCY <br />Quantity source/reference Calculation from Map, Insp. <br />'/. Swell source/reference program <br />HOURLY PRODUCTION <br />_________________ <br />_________________ <br />Loader Cycle lime <br />Unadjusted Basic Cycte Time (load, dump 8 maneuver) = 0.525 min. <br /> (CN8 054) <br />Cycle Time Factors: ' Factor (min.) <br />Material- Mixed material 0.020 (CHB ICA) <br />Pile- No adjustment - factor not applicable 0.000 (CHB 16A) <br />Truck Ownership- No adjustment - factor not applicable 0.000 (CHB ibA) <br />Operation- Constant operation -0.040 (CHB )bA) <br />Target- Nominal target 0.000 (CHB ]84) <br /> Net Cycle Time Adj.= -0.020 min. <br /> Adj. Basic Cycle Time = 0.505 min. <br />