Laserfiche WebLink
~~ <br />NOUR LY PRODUCTION corit'd Sheet 2 of 2 <br />Loader Cycle Time cc•nt'd <br />Rolling Resistance <br />___________ <br />_______ <br />R oaduay underfooti ng <br />condition <br />s: <br />Haul :RUited dti rt, littlejno maim., 1-2" fire pen. <br />Return:RUtted dirt, little/no maim., 1-2" [ire pen. <br /> Grade Rolling Total Travel <br /> Length Resis[. Resist. Resist. Time <br />Haul 8 return Time: (ft) (Y,) (7.) (y.) (min.) <br />Haul Route: 500 5.00 5.00 10.00 0.709 (CHB »l"f/:) <br />Return Route: 500 -5.00 5.00 0.00 0.347 (CHB ''/.'h~) <br /> Total travel time = 1.057 <br /> Total cycle time = y1.562 minutes <br />Loader Bucket Lapaci ty <br />Rated Capacity= 4.50 LCY (heaped) <br />Bucket fill factor= 0.875 Loose mat.- 1" and over diameter (85 - 90~) <br />Adjusted capacity= 3.94 LCY <br />Job Condition Correc+'i on Factors <br />Site altitude = 5,750 ft. <br />Altitude correction factor = 1.00 (GHB 080) <br />Job efficiency i~actor = 0.83 (1sh/day) <br />Net Correction = 0.83 multiplier <br />Unadjusted Hourly Unit Production 151.29 LCY/Hr <br />Adjusted Hourly Unit Production 125.57 LCY/Hr <br />Adjusted Hourly Fleet Production 125.57 LCY/Hr <br />JOB COST <br />Fleet size = 1 Loader(s) Total job time = 15.23 Hours <br />_______ ___________ <br />Unit cos[ = 50.592 /LCY Total job cost = 51,132.10 <br />