Laserfiche WebLink
~~ <br />HOURLY PRODUCifOH cor~t'd Sheet 2 of 2 <br />Loader Cycle Time cont'd <br />Rol Ling Resistance <br />_ <br />________________ <br />_ <br />Roadway unde rfooti <br />ng conditions: <br />Haul :Dirt or lt. :.urf aced- firm, rolling, mai nt'd <br />Return:Dirt or lt. :.urfaced- firm, rolling, maint'd <br /> Grade Rolling Total Travel <br /> Length Resist. Resist. Resist. Time <br />Haul 8 return Time: (ft) (Y.) (Y.) (X) (min.) <br />Haul Route: 200 0.00 3.00 3.00 0.202 (CHB >+U'h) <br />Return Route: 200 0.00 3.00 3.00 0.182 (CHB »irh) <br /> Total travel time = 0.383 <br /> Total cycle time = 1.008 minutes <br />Loader Bucket Capacity <br />Rated Capacity= 4.50 LCY (heaped) <br />Bucket fill factor= 0.875 Loose mat.- 1~~ and over diameter (BS - 90%) <br />Adjusted capacity= 3.94 LCY <br />Job Condition Correction Factors <br />Site altitude = 5,750 ft. <br />Altitude correction factor = 1.00 (CHB D80) <br />Job efficiency factor = 0.83 (1sh/day) <br />Net Correction = 0.83 multiplier <br />Unadjusted Hourly Unit Production 234.27 LCY/Hr <br />Adjusted Nourly Unit Production 194.45 LCY/Hr <br />Adjusted Hourly Fleet Production 194 45 LCY/Hr <br />JOB COST <br />Fleet size = 1 Loader(s) Total job time = 2.02 Hours <br /> <br />Uni[ cost _______ <br />= 50.382 /LCY <br />Total ___________ <br />job cost = 5150.52 <br />