Laserfiche WebLink
_ ~~ <br />Sheet 1 of 2 <br />Colorado Division of Minerals and Geology <br />Task #: 5 Prep. by: RCO <br />Date 07/30/97 Permit #:M-81-021 <br />__--_______- ______-_ <br />Permitting action Final Reclamation <br />_________________ <br />Task description Portal Closure <br />HOURLY EQUIPMENT COST <br />ESTIMATING FORM - WHEEL LOADER NORK <br />Task filename M021-5 <br />Mine: Nest Sunday Mine <br />Basic machine: CAT 966E <br />Attachment #1: ROPS Cab <br />(199 Horsepower = 220 <br />Shift basis:l/day <br />(DGI OSU) <br />Cost Breakdown - Ownership = 427.72 <br />-------------- - Operating-loader = 423.66 100 X utilization <br />- Operator = 422.95 <br />- Total cost/hr = 474.33 Total fleet cost/hr = E74.33 <br />MATERIAL QUANTITIES <br />_____________________ <br />Initial Suell Final <br />volume = 350.0 CCY factor = 1.125 volume = 393.8 LCY <br />ouantity source/reference Calculation from Map, Insp. <br />_____________________________________________ <br />X Suell source/reference program <br />HOURLY PRODUCTION <br />Loader Lyc to Time <br />Unadjusted Basic Lyc le Time (load, dump 8 maneuver) = 0.525 min. <br /> (CHB USA) <br />Cycle Time Factors: Factor (min.) <br />Material- Mixed material 0.020 (CHB lbA) <br />Pile- Ho adjustment - factor not applicable D.000 (CHB I6F) <br />Truck Ownership- No adjustment -factor not applicable 0.000 (CHB fbA) <br />Operation- Inconsistent operation 0.040 (CHB f6A) <br />Target- :>mall target 0.040 (CHB IbA) <br /> Net Cycle Time Adj.= 0.100 min. <br /> Adj. Basic Cycle Time = 0.625 min. <br />