Laserfiche WebLink
Section II - Hietory of Violations <br />Six enforcement <br />Five notices of <br />later vacated. <br />the same day. <br />actions have been taken by the Division since permit renewal. <br />violation• were written on May 24, 1990; three of which were <br />A sixth notice was issued on August 26, 1992 and was abated <br />DATE VIOLATION DESCRIPTION OF DATE HOW <br />ISSUED NUMBER VIOLATION ABATED ABATED <br />5-24-90 C-90-20 Failure to minimize 5-31-90 Gullies <br /> erosion of benches stabilized & <br /> located at SA portal benches bermed <br /> and boneyard <br />5-24-90 C-90-21 Failure to prevent Vacated <br /> combustion in No. 9 <br /> refuse die sal area <br />5-24-90 C-90-22 Failure to pass 5-31-90 Extended ditch <br /> drainage from a portion SH-03 along <br /> of boneyard and a drill with sediment <br /> Bite through sediment control for <br /> control structures drilling <br />5-24-90 C-90-23 Failure to maintain Vacated <br /> culverts under 5A <br /> Portal access road <br />5-24-90 C-90-24 Failure to maintain Vacated <br /> containment berm at <br /> rock crusher site <br />8-26-92 C-92-26 Failure to maintain 8-26-92 Replaced <br /> culvert and ditch culvert and <br /> around coal stockpile reopened ditch <br />Section III - Hietorv of Revisions <br />Sixteen technical revisions and 13 minor revisions have been approved for the <br />Eagle 5 and 6 Mine since the PR-O1 (permit revision) was approved on April 24, <br />1987. <br />DATE <br />APPROVED REVISION <br />NUMBER DESCRIPTION OF <br />REVISION CHANGE TO <br />HOND <br />LIABILITY CONDITIONS <br />COMPLIED <br />WITH <br />7-23-87 TR-6 Modification of + <br /> grading plan for $30,100.00 <br /> Williams Fork Strip <br /> Pit <br />10-7-87 TR-7 Construction of 0 <br /> thirteen permanent <br /> stock ponds on <br /> reclaimed portions of <br /> Utah Tract <br />