Laserfiche WebLink
DATE REVISION DESCRIPTION OF CHANGE TO CONDITIONS <br />APPROVED NUMBER REVISION BOND COMPLIED <br /> LIABILITY WITH <br />12-9-87 TR-8 Satisfaction of four 0 Water <br /> stipulations to quality <br /> permit: 1 - water monitoring <br /> monitoring plan, plan amended <br /> 2 - use of over- on 1-19-88. <br /> burden ae plant Revised <br /> medium, again as <br /> 5 - sediment control TR-9 <br /> plan, and 6 - <br /> reclamation of <br /> Williams Fork Strip <br /> Pit <br />6-3-88 TR-9 Modification of water 0 <br /> quality monitoring <br /> lan see TR-8 <br />8-16-89 TR-10 Construction of new 0 Stipula- <br /> haul road (see stip- tiona 1 H 2 <br /> ulatione) attached. <br /> Never built. <br />10-17-88 TA-11 Construction of 7N $5,410 <br /> Angle dewatering well (Operator <br /> and ditch 9-D14 estimate <br /> for well <br />11-1-88 TR-12 To discontinue 0 <br /> subsidence monitoring <br /> of No. 5 mine <br />6-6-89 TR-13 Construction of + <br /> multiple service $51,167 <br /> building and 100,000 <br /> gallon water storage <br /> tank <br />6-26-89 TR-14 Change in design of 0 <br /> drainage ditches for <br /> coal waste ile <br />11-14-89 TR-15 Revision of 0 <br /> revegetation <br /> monitoring plan and <br /> methodolo <br />5-22-90 TR-16 Sedcad reevaluation 0 Stipulation <br /> of all ditches and ~3: <br /> culverts, elimination Containment <br /> of pond HR-P3; new berm built. <br /> small area exemption operator to <br /> remove coal <br /> quarterly <br />