Laserfiche WebLink
STIPULATION NO. 7 <br /> A PERFORMANCE BOND IN THE AMOUNT OF S800,871.00, PAYABLE TO THE STATE OF <br /> COLORADO AND THE OFFICE OF SURFACE MINING,MUST BE FILED WITH THE DIVISION <br /> PRIOR TO CONSTRUCTION OF CAMEO REFUSE AREA NO. 3. <br /> STIPULATION NO. 15 <br /> PR-02 IS CONDITIONAL UPON RESOLUTION OF SIX KENTUCKY CIVIL PENALTY <br /> VIOLATIONS ASSOCIATED WITH PERMIT NO 8670201 AND THREE VIRGINIA CMIS <br /> VIOLATIONS ASSOCIATED WITH PERMIT NO. 2850. PROOF OF RESOLUTION IS TO BE <br /> SUBMITTED TO DMG AS SOON AS IT IS AVAILABLE. <br /> STIPULATION NO. 16 <br /> WITHIN 180 DAYS OF FINAL APPROVAL OF PR-02, THE PERMITTEE WILL SUBMIT A <br /> REVISED WILDLIFE HABITAT MAP WHICH ACCURATELY DEPICTS THE LOCATION AND <br /> EXTENT OF MULE DEER SEVERE WINTER RANGE"CRITICAL HABITAT',AS CURRENTLY <br /> DESIGNATED BY THE COLORADO DIVISION OF WILDLIFE ,WITHIN THE PERMIT AND <br /> ADJACENT AREA. <br /> STIPULATION NO. 17 <br /> WITHIN 180 DAYS OF FINAL APPROVAL OF PR-02, AND PRIOR TO ANY FURTHER FINAL <br /> RECLAMATION TOPSOILING OR REVEGETATION ACTIVITY, THE PERMITTEE WILL <br /> SUBMIT AN AMENDED PLAN FOR REPLACEMENT OF SURFACE ROCK ON RECLAIMED <br /> AREAS, WHICH IS IN ACCORDANCE WITH SPECIFICATIONS AND PARAMETERS AS <br /> TENTATIVELY RESOLVED BY REPRESENTATIVES OF DOW,PCC,AND DMG AT THE MINE <br /> ON AUGUST 8, 1997. <br /> STIPULATION NO. 18 <br /> WITHIN 180 DAYS OF FINAL APPROVAL OF PR-02, THE PERMITTEE WILL SUBMIT <br /> APPROPRIATE CERTIFICATION STATEMENTS OR RELEVANT SHOWING STATEMENTS IN <br /> LIEU OF CERTIFICATION FOR HAUL ROAD SEGMENTS AND ACCESS ROAD SEGMENTS <br /> NOT WITHIN THE DISTURBED AREA, TO COMPLY WITH RULES 4.03.1(1)(d)(i), <br /> 4.03.1(1)(d)(ii), 4.03.2(1)(f)(i), OR 4.03.2(1)(f)(ii), AS APPLICABLE. <br /> STIPULATION NO. 19 <br /> WITHIN 180 DAYS OF FINAL APPROVAL OF PR-02, THE PERMITTEE WILL SUBMIT <br /> DESIGNS FOR A STABLE PERMANENT CHANNEL TO BE CONSTRUCTED IN ASSOCIATION <br /> 3 <br />