Laserfiche WebLink
i <br /> WITH FINAL RECLAMATION OF THE RSRDA,WHICH WILL SAFELY CONVEY FLOW FROM <br /> DRAINAGE AREA 121-1 TO THE BASE OF THE RSRDA. <br /> STIPULATION NO. 20 <br /> WITHIN I80 DAYS OF FINAL APPROVAL OF PR-02, THE PERMITTEE WRLL COMPLETE <br /> CONSTRUCTION OF THE PROPOSED 100 YEAR DIVERSION ALONG LIGHT USE ROAD I <br /> AND SUBMIT A QUALIFIED REGISTERED PROFESSIONAL ENGINEER'S CERTIFICATION <br /> THAT BOTH THE LIGHT USE ROAD 1 DITCH SEGMENT AND THE SOUTH DIVERSION <br /> DITCH HAVE BEEN CONSTRUCTED IN ACCORDANCE WITH ALL APPLICABLE <br /> PERFORMANCE STANDARDS AND DESIGN.CRITERIA. <br /> STIPULATION NO. 21 <br /> A COPY OF THE FINAL AIR EMISSION PERMIT FOR CRDA-I WILL BE SUBMITTED TO THE <br /> DIVISION UPON ISSUANCE. A COPY OF THE AIR EMISSION PERMIT FOR CRDA-3 WILL BE <br /> SUBMITTED TO THE DIVISION PRIOR TO INITIATION OF WASTE DISPOSAL AT THE SITE. <br /> STIPULATION NO. 22 <br /> AT LEAST 120 DAYS PRIOR TO INITIATION OF COAL EXTRACTION WHICH COULD <br /> POTENTIALLY CAUSE SUBSIDENCE DAMAGE TO THE 345 KV RIFLE-SAN JUAN <br /> POWERLINE,THE PERMITTEE WILL SUBMIT WRITTEN STATEMENTS FROM THE OWNERS <br /> OF THE POWERLINE WHICH INDICATE THAT POTENTIAL WORST CASE SUBSIDENCE <br /> DAMAGE TO THE POWER LINE COULD BE REPAIRED WITHOUT DISRUPTION OF SERVICE. <br /> NO MINING WHICH COULD AFFECT THE POWERLINE BASED ON PROJECTED <br /> SUBSIDENCE ANGLE OF DRAW SHALL OCCUR PRIOR TO DMG'S WRITTEN NOTICE OF <br /> COMPLIANCE WITH THIS STIPULATION. <br /> 4 <br />